Titulos de Deuda Publica Clase 23 a tasa variable Vto. 02-2028
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2018-02-22100.00100.007.310.007.31
2018-05-22100.00100.007.070.007.07
2018-08-22100.00100.009.010.009.01
2018-11-22100.00100.0012.070.0012.07
2019-02-22100.00100.0012.800.0012.80
2019-05-22100.00100.0011.640.0011.64
2019-08-22100.00100.0013.710.0013.71
2019-11-22100.00100.0015.180.0015.18
2020-02-22100.00100.0010.970.0010.97
2020-05-22100.00100.007.270.007.27
2020-08-22100.00100.008.140.008.14
2020-11-22100.00100.008.570.008.57
2021-02-22100.00100.009.520.009.52
2021-05-22100.00100.009.230.009.23
2021-08-22100.00100.009.550.009.55
2021-11-22100.00100.009.550.009.55
2022-02-22100.00100.009.900.009.90
2022-05-22100.00100.0011.040.0011.04
2022-08-22100.00100.0013.440.0013.44
2022-11-22100.00100.0017.690.0017.69
2023-02-22100.00100.0018.420.0018.42
2023-05-22100.00100.0018.780.0018.78
2023-08-22100.00100.0024.210.0024.21
2023-11-22100.00100.0030.150.0030.15
2024-02-22100.00100.0030.680.0030.68
2024-05-22100.00100.0020.500.0020.50
2024-08-22100.00100.0010.780.0010.78
2024-11-22100.00100.0010.780.0010.78
2025-02-22100.00100.0010.780.0010.78
2025-05-22100.00100.0010.430.0010.43
2025-08-22100.00100.0010.780.0010.78
2025-11-22100.00100.0010.780.0010.78
2026-02-22100.00100.0010.780.0010.78
2026-05-22100.00100.0010.430.0010.43
2026-08-22100.00100.0010.780.0010.78
2026-11-22100.00100.0010.780.0010.78
2027-02-22100.00100.0010.780.0010.78
2027-05-22100.00100.0010.430.0010.43
2027-08-22100.00100.0010.780.0010.78
2027-11-22100.00100.0010.780.0010.78
2028-02-220.000.0010.78100.00110.78
Datos
SimboloBDC28Valor Tecnico107.73Semana TIR-3.35%
EmisorCiudad de BS. AS.Ciudad de BS. AS.Valor Residual100.00%Mes TIR-27.20%
TipoProvincialParidad101.18%Semestre TIR-71.78%
PaísArgentinaTIR49.09%1ero Enero TIR-74.25%
MercadoBYMAMacaulay Dur.1.86Año TIR-63.05%
MonedaARSModified Dur.1.25Semana Precio-2.46%
Fecha/Hora2024-07-26 16:52:55Effective Dur.0.61Mes Precio4.81%
Volumen1761000Convexidad3.13Semestre Precio-17.42%
Precio109.00Int. Corrido7.731ero Enero Precio-6.44%
Variación-1.00%Cupon10.78Año Precio-4.80%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
119.9010.00%41.79-14.88%
118.819.00%42.46-13.51%
117.728.00%43.14-12.12%
116.637.00%43.83-10.71%
115.546.00%44.54-9.26%
114.455.00%45.26-7.79%
113.364.00%46.00-6.30%
112.273.00%46.75-4.77%
111.182.00%47.51-3.21%
110.091.00%48.29-1.62%
109.000.00%49.090.00%
107.91-1.00%49.901.65%
106.82-2.00%50.733.33%
105.73-3.00%51.575.06%
104.64-4.00%52.436.81%
103.55-5.00%53.328.61%
102.46-6.00%54.2210.45%
101.37-7.00%55.1412.32%
100.28-8.00%56.0814.24%
99.19-9.00%57.0416.20%
98.10-10.00%58.0318.21%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
53.519.00%103.32-5.21%
53.028.00%103.92-4.66%
52.537.00%104.53-4.10%
52.046.00%105.14-3.54%
51.545.00%105.76-2.97%
51.054.00%106.40-2.39%
50.563.00%107.03-1.80%
50.072.00%107.68-1.21%
49.581.00%108.33-0.61%
49.090.00%109.000.00%
48.60-1.00%109.670.61%
48.11-2.00%110.351.23%
47.62-3.00%111.031.86%
47.13-4.00%111.732.50%
46.64-5.00%112.433.15%
46.14-6.00%113.153.80%
45.65-7.00%113.874.47%
45.16-8.00%114.605.14%
44.67-9.00%115.345.82%
Desarrollo TIR
Desarrollo TIR 49.09%
FechaFormulaOperacionFactorTipo
2024-08-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(26/365)]10.48i
2024-11-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(118/365)]9.47i
2025-02-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(210/365)]8.57i
2025-05-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (89/365)) x 100.00% x 100.00]/[(1+49.09)^(299/365)]7.52i
2025-08-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(391/365)]7.03i
2025-11-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(483/365)]6.35i
2026-02-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(575/365)]5.75i
2026-05-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (89/365)) x 100.00% x 100.00]/[(1+49.09)^(664/365)]5.04i
2026-08-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(756/365)]4.71i
2026-11-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(848/365)]4.26i
2027-02-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(940/365)]3.85i
2027-05-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (89/365)) x 100.00% x 100.00]/[(1+49.09)^(1029/365)]3.38i
2027-08-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(1121/365)]3.16i
2027-11-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(1213/365)]2.86i
2028-02-22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(1305/365)]2.58i
2028-02-22[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00]/[(1+49.09)^(1305/365)]23.98k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2024-07-27((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones)(0.4276 x (92/365)) x 1 x 100.00 x (66/92)7.73
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2024-08-22(Dias para cupon / Dias Año)(26 / 365)0.07[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(26/365)]10.480.100.01i
2024-11-22(Dias para cupon / Dias Año)(118 / 365)0.32[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(118/365)]9.470.090.03i
2025-02-22(Dias para cupon / Dias Año)(210 / 365)0.58[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(210/365)]8.570.080.05i
2025-05-22(Dias para cupon / Dias Año)(299 / 365)0.82[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (89/365)) x 100.00% x 100.00]/[(1+49.09)^(299/365)]7.520.070.06i
2025-08-22(Dias para cupon / Dias Año)(391 / 365)1.07[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(391/365)]7.030.060.07i
2025-11-22(Dias para cupon / Dias Año)(483 / 365)1.32[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(483/365)]6.350.060.08i
2026-02-22(Dias para cupon / Dias Año)(575 / 365)1.58[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(575/365)]5.750.050.08i
2026-05-22(Dias para cupon / Dias Año)(664 / 365)1.82[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (89/365)) x 100.00% x 100.00]/[(1+49.09)^(664/365)]5.040.050.08i
2026-08-22(Dias para cupon / Dias Año)(756 / 365)2.07[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(756/365)]4.710.040.09i
2026-11-22(Dias para cupon / Dias Año)(848 / 365)2.32[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(848/365)]4.260.040.09i
2027-02-22(Dias para cupon / Dias Año)(940 / 365)2.58[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(940/365)]3.850.040.09i
2027-05-22(Dias para cupon / Dias Año)(1029 / 365)2.82[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (89/365)) x 100.00% x 100.00]/[(1+49.09)^(1029/365)]3.380.030.09i
2027-08-22(Dias para cupon / Dias Año)(1121 / 365)3.07[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(1121/365)]3.160.030.09i
2027-11-22(Dias para cupon / Dias Año)(1213 / 365)3.32[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(1213/365)]2.860.030.09i
2028-02-22(Dias para cupon / Dias Año)(1305 / 365)3.58[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00]/[(1+49.09)^(1305/365)]+[((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(1305/365)]26.570.240.87ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores1.861.86
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(1.86)/(1 + 49.09/100)1.25
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(108.34 - 109.67 )/( 2 x 109 x 0.01)0.61
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2024-08-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](26 / 365) ^ 2 + (26 / 365)0.08[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(26/365)]10.480.80i
2024-11-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](118 / 365) ^ 2 + (118 / 365)0.43[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(118/365)]9.474.05i
2025-02-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](210 / 365) ^ 2 + (210 / 365)0.91[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(210/365)]8.577.76i
2025-05-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](299 / 365) ^ 2 + (299 / 365)1.49[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (89/365)) x 100.00% x 100.00]/[(1+49.09)^(299/365)]7.5211.20i
2025-08-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](391 / 365) ^ 2 + (391 / 365)2.22[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(391/365)]7.0315.59i
2025-11-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](483 / 365) ^ 2 + (483 / 365)3.07[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(483/365)]6.3519.53i
2026-02-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](575 / 365) ^ 2 + (575 / 365)4.06[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(575/365)]5.7523.31i
2026-05-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](664 / 365) ^ 2 + (664 / 365)5.13[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (89/365)) x 100.00% x 100.00]/[(1+49.09)^(664/365)]5.0425.86i
2026-08-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](756 / 365) ^ 2 + (756 / 365)6.36[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(756/365)]4.7129.98i
2026-11-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](848 / 365) ^ 2 + (848 / 365)7.72[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(848/365)]4.2632.91i
2027-02-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](940 / 365) ^ 2 + (940 / 365)9.21[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(940/365)]3.8535.48i
2027-05-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1029 / 365) ^ 2 + (1029 / 365)10.77[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (89/365)) x 100.00% x 100.00]/[(1+49.09)^(1029/365)]3.3836.42i
2027-08-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1121 / 365) ^ 2 + (1121 / 365)12.50[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(1121/365)]3.1639.53i
2027-11-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1213 / 365) ^ 2 + (1213 / 365)14.37[((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(1213/365)]2.8641.07i
2028-02-22[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1305 / 365) ^ 2 + (1305 / 365)16.36[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [((Badlar + Margen) x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00]/[(1+49.09)^(1305/365)]+[((39.0125 + 3.75) x (92/365)) x 100.00% x 100.00]/[(1+49.09)^(1305/365)]26.57434.59ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [109 x ((1 + 49.0876875) ^ 2)]] x 758.10]3.13
Badlar
Desarrollo Badlar
FechaDiaBadlar
2024-04-17Miercoles61.3100
2024-04-18Jueves61.0000
2024-04-19Viernes61.8100
2024-04-22Lunes61.8100
2024-04-23Martes60.8100
2024-04-24Miercoles61.0000
2024-04-25Jueves61.2500
2024-04-26Viernes56.5000
2024-04-29Lunes50.6900
2024-04-30Martes50.8100
2024-05-02Jueves50.8100
2024-05-03Viernes47.8800
2024-05-06Lunes40.9400
2024-05-07Martes40.3100
2024-05-08Miercoles40.4400
2024-05-09Jueves39.7500
2024-05-10Viernes40.1300
2024-05-13Lunes39.3800
2024-05-14Martes39.7500
2024-05-15Miercoles39.1900
2024-05-16Jueves32.5000
2024-05-17Viernes32.0600
2024-05-20Lunes31.1900
2024-05-21Martes31.9400
2024-05-22Miercoles31.8800
2024-05-23Jueves31.5600
2024-05-24Viernes30.6300
2024-05-27Lunes32.1900
2024-05-28Martes31.6300
2024-05-29Miercoles31.6900
2024-05-30Jueves32.3800
2024-05-31Viernes32.1300
2024-06-03Lunes33.3800
2024-06-04Martes32.0600
2024-06-05Miercoles32.3800
2024-06-06Jueves32.5600
2024-06-07Viernes32.8800
2024-06-10Lunes32.9400
2024-06-11Martes31.7500
2024-06-12Miercoles34.6300
2024-06-13Jueves33.4400
2024-06-14Viernes33.6300
2024-06-18Martes33.8100
2024-06-19Miercoles32.6300
2024-06-24Lunes34.5000
2024-06-25Martes33.3800
2024-06-26Miercoles35.1900
2024-06-27Jueves32.8800
2024-06-28Viernes33.5600
2024-07-01Lunes36.0600
2024-07-02Martes34.1900
2024-07-03Miercoles36.5000
2024-07-04Jueves34.9400
2024-07-05Viernes33.8800
2024-07-08Lunes36.0000
2024-07-10Miercoles35.8100
2024-07-11Jueves34.2500
2024-07-12Viernes35.5600
2024-07-15Lunes37.0600
2024-07-16Martes36.0600
2024-07-17Miercoles36.5000
   
Promedio Badlar39.0125
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2017-11-22
F. de Vencimiento2028-02-22
AjusteBadlar
Dias previos para calculo ajuste o interes8
CapitalIntegra al Vencimiento.
InteresLos Títulos de la Clase Nº 23 en circulación devengarán intereses en forma trimestral sobre su capital pendiente de pago a una tasa variable anual que será equivalente a la suma de (a) la Tasa Badlar más (b) el 3.75%. La "Tasa Badlar" para cada Período de Devengamiento de Intereses será equivalente al promedio aritmético simple de las tasas de interés para depósitos a plazo fijo en Pesos de más de un millón de Pesos por períodos de entre 30 y 35 días que se publica diariamente en el boletín estadístico del BCRA, durante el período que se inicia el octavo Día Hábil anterior al inicio de cada Período de Devengamiento de Intereses, inclusive, y finaliza el octavo Día Hábil anterior a la finalización del Período de Devengamiento de Intereses correspondiente, exclusivo. Para el cálculo de los intereses, tanto compensatorios como punitorios, se considerará un año de 365 días (cantidad de días transcurridos/365).
Frecuencia Pago trimestral los meses de febrero, mayo, agosto y noviembre de cada año. 1er. pago 22/02/2018.
ISINARCBAS3201J5
¿Ves algun dato que parece incorrecto?