Plaza Logistica. Clase XV. Tasa fija 7%. USD. Vto. 06-2028.
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2025-06-04100.00100.003.500.003.50
2025-09-04100.00100.001.750.001.75
2025-12-04100.00100.001.750.001.75
2026-03-04100.00100.001.750.001.75
2026-06-04100.00100.001.750.001.75
2026-09-04100.00100.001.750.001.75
2026-12-04100.00100.001.750.001.75
2027-03-04100.00100.001.750.001.75
2027-06-04100.00100.001.750.001.75
2027-09-04100.00100.001.750.001.75
2027-12-04100.00100.001.750.001.75
2028-03-04100.00100.001.750.001.75
2028-06-040.000.001.75100.00101.75
Datos
SimboloPZCGDValor Tecnico103.01Semana TIR11.98%
EmisorPlaza Logistica S.A.Plaza Logistica S.A.Valor Residual100.00%Mes TIR-3.95%
TipoCorporativoParidad93.87%Semestre TIRS/D
PaísArgentinaTIR9.72%1ero Enero TIR32.21%
MercadoBYMAMacaulay Dur.2.69Año TIRS/D
MonedaUSDModified Dur.2.45Semana Precio-2.32%
Fecha/Hora2025-05-09 16:47:36Effective Dur.0.24Mes Precio1.79%
Volumen1870Convexidad8.85Semestre PrecioS/D
Precio96.70Int. Corrido3.011ero Enero Precio-3.30%
Variación0.73%Cupon3.50Año PrecioS/D
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
106.3710.00%5.92-39.07%
105.409.00%6.28-35.40%
104.448.00%6.64-31.68%
103.477.00%7.01-27.90%
102.506.00%7.38-24.08%
101.535.00%7.76-20.21%
100.574.00%8.14-16.28%
99.603.00%8.53-12.29%
98.632.00%8.92-8.25%
97.671.00%9.32-4.15%
96.700.00%9.720.00%
95.73-1.00%10.134.23%
94.77-2.00%10.558.52%
93.80-3.00%10.9712.88%
92.83-4.00%11.4017.30%
91.87-5.00%11.8421.78%
90.90-6.00%12.2826.33%
89.93-7.00%12.7330.97%
88.96-8.00%13.1935.67%
88.00-9.00%13.6540.45%
87.03-10.00%14.1245.30%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
10.599.00%94.66-2.11%
10.508.00%94.88-1.88%
10.407.00%95.11-1.65%
10.306.00%95.33-1.41%
10.215.00%95.56-1.18%
10.114.00%95.79-0.94%
10.013.00%96.01-0.71%
9.912.00%96.24-0.47%
9.821.00%96.47-0.24%
9.720.00%96.700.00%
9.62-1.00%96.930.24%
9.53-2.00%97.170.48%
9.43-3.00%97.400.72%
9.33-4.00%97.630.96%
9.23-5.00%97.871.21%
9.14-6.00%98.101.45%
9.04-7.00%98.341.69%
8.94-8.00%98.571.94%
8.85-9.00%98.812.18%
Desarrollo TIR
Desarrollo TIR 9.72%
FechaFormulaOperacionFactorTipo
2025-06-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (180/360)) x 100.00% x 100.00]/[(1+9.72)^(25/360)]3.48i
2025-09-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(115/360)]1.70i
2025-12-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(205/360)]1.66i
2026-03-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(295/360)]1.62i
2026-06-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(385/360)]1.58i
2026-09-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(475/360)]1.55i
2026-12-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(565/360)]1.51i
2027-03-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(655/360)]1.48i
2027-06-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(745/360)]1.44i
2027-09-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(835/360)]1.41i
2027-12-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(925/360)]1.38i
2028-03-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(1015/360)]1.35i
2028-06-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(1105/360)]1.32i
2028-06-04[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00]/[(1+9.72)^(1105/360)]75.22k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-09(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones)(0.07 x (180/360)) x 1.00 x 1 x 100.00 x (155/180)3.01
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-06-04(Dias para cupon / Dias Año)(25 / 360)0.07[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (180/360)) x 100.00% x 100.00]/[(1+9.72)^(25/360)]3.480.040.00i
2025-09-04(Dias para cupon / Dias Año)(115 / 360)0.32[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(115/360)]1.700.020.01i
2025-12-04(Dias para cupon / Dias Año)(205 / 360)0.57[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(205/360)]1.660.020.01i
2026-03-04(Dias para cupon / Dias Año)(295 / 360)0.82[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(295/360)]1.620.020.01i
2026-06-04(Dias para cupon / Dias Año)(385 / 360)1.07[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(385/360)]1.580.020.02i
2026-09-04(Dias para cupon / Dias Año)(475 / 360)1.32[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(475/360)]1.550.020.02i
2026-12-04(Dias para cupon / Dias Año)(565 / 360)1.57[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(565/360)]1.510.020.02i
2027-03-04(Dias para cupon / Dias Año)(655 / 360)1.82[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(655/360)]1.480.020.03i
2027-06-04(Dias para cupon / Dias Año)(745 / 360)2.07[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(745/360)]1.440.010.03i
2027-09-04(Dias para cupon / Dias Año)(835 / 360)2.32[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(835/360)]1.410.010.03i
2027-12-04(Dias para cupon / Dias Año)(925 / 360)2.57[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(925/360)]1.380.010.04i
2028-03-04(Dias para cupon / Dias Año)(1015 / 360)2.82[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(1015/360)]1.350.010.04i
2028-06-04(Dias para cupon / Dias Año)(1105 / 360)3.07[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00]/[(1+9.72)^(1105/360)]+[(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(1105/360)]76.530.792.43ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores2.692.69
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(2.69)/(1 + 9.72/100)2.45
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(96.47 - 96.93 )/( 2 x 96.7 x 0.01)0.24
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-06-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](25 / 360) ^ 2 + (25 / 360)0.07[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (180/360)) x 100.00% x 100.00]/[(1+9.72)^(25/360)]3.480.26i
2025-09-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](115 / 360) ^ 2 + (115 / 360)0.42[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(115/360)]1.700.72i
2025-12-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](205 / 360) ^ 2 + (205 / 360)0.89[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(205/360)]1.661.48i
2026-03-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](295 / 360) ^ 2 + (295 / 360)1.49[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(295/360)]1.622.42i
2026-06-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](385 / 360) ^ 2 + (385 / 360)2.21[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(385/360)]1.583.51i
2026-09-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](475 / 360) ^ 2 + (475 / 360)3.06[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(475/360)]1.554.74i
2026-12-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](565 / 360) ^ 2 + (565 / 360)4.03[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(565/360)]1.516.10i
2027-03-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](655 / 360) ^ 2 + (655 / 360)5.13[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(655/360)]1.487.58i
2027-06-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](745 / 360) ^ 2 + (745 / 360)6.35[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(745/360)]1.449.17i
2027-09-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](835 / 360) ^ 2 + (835 / 360)7.70[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(835/360)]1.4110.86i
2027-12-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](925 / 360) ^ 2 + (925 / 360)9.17[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(925/360)]1.3812.65i
2028-03-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1015 / 360) ^ 2 + (1015 / 360)10.77[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(1015/360)]1.3514.51i
2028-06-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1105 / 360) ^ 2 + (1105 / 360)12.49[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00]/[(1+9.72)^(1105/360)]+[(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.72)^(1105/360)]76.53955.98ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [96.7 x ((1 + 9.722) ^ 2)]] x 1029.98]8.85
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2024-12-04
F. de Vencimiento2028-06-04
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl capital de las Obligaciones Negociables será amortizado en un único pago en la Fecha de Vencimiento.
InteresTNA 7%
FrecuenciaLos intereses serán pagaderos trimestralmente, en forma vencida, a partir del sexto mes contado desde la Fecha de Emisión y Liquidación inclusive, es decir en las siguientes fechas (o día hábil siguiente): (i) 4 de junio 2025; (ii) 4 de septiembre de 2025, (iii) 4 diciembre de 2025, (iv) 4 de marzo de 2026; (v) 4 de junio 2026; (vi) 4 de septiembre de 2026, (vii) 4 diciembre de 2026, (viii) 4 de marzo de 2027; (ix) 4 de junio 2027; (x) 4 de septiembre de 2027, (xi) 4 diciembre de 2027, (xii) 4 de marzo de 2028; (xiii) 4 de junio 2028;
ISINAR0560145721
¿Ves algun dato que parece incorrecto?