Mediterranea y Roca. Clase XXXIX. Serie A. Tasa fija 11.00% USD. Vto. 11-2031.
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2025-05-01100.00119787.006185.670.006185.67
2025-11-01100.00115144.006332.920.006332.92
2026-05-0198.50113416.846332.921727.168060.08
2026-11-0197.00111689.686237.931727.167965.09
2027-05-0194.50108811.086142.932878.609021.53
2027-11-0192.00105932.485984.612878.608863.21
2028-05-0184.5097296.685826.298635.8014462.09
2028-11-0177.0088660.885351.328635.8013987.12
2029-05-0166.0075995.044876.3512665.8417542.19
2029-11-0155.0063329.204179.7312665.8416845.57
2030-05-0144.0050663.363483.1112665.8416148.95
2030-11-0133.0037997.522786.4812665.8415452.32
2031-05-0122.0025331.682089.8612665.8414755.70
2031-11-010.000.001393.2425331.6826724.92
Expresar en moneda de pago CCL
Datos
SimboloMR39OValor Tecnico115390.28Semana TIR-15.32%
EmisorGeneración Mediterranea S.A. Generación Mediterranea S.A. y Central Termica Roca S.A.Valor Residual100.00%Mes TIR65.91%
TipoCorporativoParidad66.38%Semestre TIRS/D
PaísArgentinaTIR24.77%1ero Enero TIR109.56%
MercadoBYMAMacaulay Dur.3.40Año TIRS/D
MonedaARSModified Dur.2.72Semana Precio0.00%
Fecha/Hora2025-04-30 17:00:20Effective Dur.0.67Mes Precio-40.06%
Volumen0Convexidad11.74Semestre PrecioS/D
Precio76600.00Int. Corrido246.281ero Enero Precio-35.22%
Variación0.00%Cupon6332.92Año PrecioS/D
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
84260.0010.00%21.36-13.73%
83494.009.00%21.68-12.45%
82728.008.00%22.00-11.14%
81962.007.00%22.33-9.82%
81196.006.00%22.66-8.48%
80430.005.00%23.00-7.12%
79664.004.00%23.34-5.73%
78898.003.00%23.69-4.33%
78132.002.00%24.04-2.90%
77366.001.00%24.40-1.45%
76600.000.00%24.770.00%
75834.00-1.00%25.131.51%
75068.00-2.00%25.513.03%
74302.00-3.00%25.894.58%
73536.00-4.00%26.286.14%
72770.00-5.00%26.687.74%
72004.00-6.00%27.089.36%
71238.00-7.00%27.4911.01%
70472.00-8.00%27.9012.69%
69706.00-9.00%28.3314.40%
68940.00-10.00%28.7616.14%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
26.999.00%72172.95-5.78%
26.748.00%72645.34-5.16%
26.497.00%73122.68-4.54%
26.256.00%73605.04-3.91%
26.005.00%74092.48-3.27%
25.754.00%74585.08-2.63%
25.503.00%75082.90-1.98%
25.262.00%75586.02-1.32%
25.011.00%76094.50-0.66%
24.760.00%76600.000.00%
24.51-1.00%77127.850.69%
24.26-2.00%77652.881.37%
24.02-3.00%78183.572.07%
23.77-4.00%78720.002.77%
23.52-5.00%79262.253.48%
23.27-6.00%79810.414.19%
23.03-7.00%80364.554.91%
22.78-8.00%80924.775.65%
22.53-9.00%81491.136.39%
Desarrollo TIR
Desarrollo TIR 24.77%
FechaFormulaOperacionFactorTipo
2025-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+24.77)^(173/360)]5694.00i
2026-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+24.77)^(353/360)]5097.56i
2026-05-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1151.44]/[(1+24.77)^(353/360)]1390.24k
2026-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 98.50% x 100.00 x 1151.44]/[(1+24.77)^(533/360)]4495.15i
2026-11-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1151.44]/[(1+24.77)^(533/360)]1244.62k
2027-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 97.00% x 100.00 x 1151.44]/[(1+24.77)^(713/360)]3963.00i
2027-05-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1151.44]/[(1+24.77)^(713/360)]1857.08k
2027-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 94.50% x 100.00 x 1151.44]/[(1+24.77)^(893/360)]3456.44i
2027-11-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1151.44]/[(1+24.77)^(893/360)]1662.55k
2028-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 92.00% x 100.00 x 1151.44]/[(1+24.77)^(1073/360)]3012.52i
2028-05-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1151.44]/[(1+24.77)^(1073/360)]4465.20k
2028-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 84.50% x 100.00 x 1151.44]/[(1+24.77)^(1253/360)]2477.10i
2028-11-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1151.44]/[(1+24.77)^(1253/360)]3997.48k
2029-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 77.00% x 100.00 x 1151.44]/[(1+24.77)^(1433/360)]2020.80i
2029-05-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1433/360)]5248.83k
2029-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 66.00% x 100.00 x 1151.44]/[(1+24.77)^(1613/360)]1550.68i
2029-11-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1613/360)]4699.02k
2030-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 55.00% x 100.00 x 1151.44]/[(1+24.77)^(1793/360)]1156.87i
2030-05-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1793/360)]4206.80k
2030-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 44.00% x 100.00 x 1151.44]/[(1+24.77)^(1973/360)]828.55i
2030-11-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1973/360)]3766.14k
2031-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 33.00% x 100.00 x 1151.44]/[(1+24.77)^(2153/360)]556.32i
2031-05-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(2153/360)]3371.64k
2031-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 22.00% x 100.00 x 1151.44]/[(1+24.77)^(2333/360)]332.03i
2031-11-01[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.22 x 100.00 x 1151.44]/[(1+24.77)^(2333/360)]6036.94k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-08(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL x (Dias Corridos / Dias entre Cupones)(0.11 x (180/360)) x 1.00 x 1 x 100.00 x 1151.44 x (7/180)246.28
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-11-01(Dias para cupon / Dias Año)(173 / 360)0.48[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+24.77)^(173/360)]5694.110.070.04i
2026-05-01(Dias para cupon / Dias Año)(353 / 360)0.98[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1151.44]/[(1+24.77)^(353/360)]+[(0.11 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+24.77)^(353/360)]6488.060.080.08ki
2026-11-01(Dias para cupon / Dias Año)(533 / 360)1.48[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1151.44]/[(1+24.77)^(533/360)]+[(0.11 x (180/360)) x 98.50% x 100.00 x 1151.44]/[(1+24.77)^(533/360)]5740.100.070.11ki
2027-05-01(Dias para cupon / Dias Año)(713 / 360)1.98[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1151.44]/[(1+24.77)^(713/360)]+[(0.11 x (180/360)) x 97.00% x 100.00 x 1151.44]/[(1+24.77)^(713/360)]5820.540.080.15ki
2027-11-01(Dias para cupon / Dias Año)(893 / 360)2.48[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1151.44]/[(1+24.77)^(893/360)]+[(0.11 x (180/360)) x 94.50% x 100.00 x 1151.44]/[(1+24.77)^(893/360)]5119.500.070.17ki
2028-05-01(Dias para cupon / Dias Año)(1073 / 360)2.98[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1151.44]/[(1+24.77)^(1073/360)]+[(0.11 x (180/360)) x 92.00% x 100.00 x 1151.44]/[(1+24.77)^(1073/360)]7478.610.100.29ki
2028-11-01(Dias para cupon / Dias Año)(1253 / 360)3.48[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1151.44]/[(1+24.77)^(1253/360)]+[(0.11 x (180/360)) x 84.50% x 100.00 x 1151.44]/[(1+24.77)^(1253/360)]6475.480.080.29ki
2029-05-01(Dias para cupon / Dias Año)(1433 / 360)3.98[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1433/360)]+[(0.11 x (180/360)) x 77.00% x 100.00 x 1151.44]/[(1+24.77)^(1433/360)]7270.780.090.38ki
2029-11-01(Dias para cupon / Dias Año)(1613 / 360)4.48[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1613/360)]+[(0.11 x (180/360)) x 66.00% x 100.00 x 1151.44]/[(1+24.77)^(1613/360)]6250.810.080.37ki
2030-05-01(Dias para cupon / Dias Año)(1793 / 360)4.98[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1793/360)]+[(0.11 x (180/360)) x 55.00% x 100.00 x 1151.44]/[(1+24.77)^(1793/360)]5364.740.070.35ki
2030-11-01(Dias para cupon / Dias Año)(1973 / 360)5.48[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1973/360)]+[(0.11 x (180/360)) x 44.00% x 100.00 x 1151.44]/[(1+24.77)^(1973/360)]4595.700.060.33ki
2031-05-01(Dias para cupon / Dias Año)(2153 / 360)5.98[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(2153/360)]+[(0.11 x (180/360)) x 33.00% x 100.00 x 1151.44]/[(1+24.77)^(2153/360)]3928.910.050.31ki
2031-11-01(Dias para cupon / Dias Año)(2333 / 360)6.48[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.22 x 100.00 x 1151.44]/[(1+24.77)^(2333/360)]+[(0.11 x (180/360)) x 22.00% x 100.00 x 1151.44]/[(1+24.77)^(2333/360)]6370.620.080.54ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores3.403.40
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(3.40)/(1 + 24.77/100)2.72
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(76084.07 - 77117.42 )/( 2 x 76600.00 x 0.01)0.67
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](173 / 360) ^ 2 + (173 / 360)0.71[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+24.77)^(173/360)]5694.114051.30i
2026-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](353 / 360) ^ 2 + (353 / 360)1.94[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1151.44]/[(1+24.77)^(353/360)]+[(0.11 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+24.77)^(353/360)]6488.0612600.11ki
2026-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](533 / 360) ^ 2 + (533 / 360)3.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1151.44]/[(1+24.77)^(533/360)]+[(0.11 x (180/360)) x 98.50% x 100.00 x 1151.44]/[(1+24.77)^(533/360)]5740.1021081.11ki
2027-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](713 / 360) ^ 2 + (713 / 360)5.90[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1151.44]/[(1+24.77)^(713/360)]+[(0.11 x (180/360)) x 97.00% x 100.00 x 1151.44]/[(1+24.77)^(713/360)]5820.5434359.55ki
2027-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](893 / 360) ^ 2 + (893 / 360)8.63[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1151.44]/[(1+24.77)^(893/360)]+[(0.11 x (180/360)) x 94.50% x 100.00 x 1151.44]/[(1+24.77)^(893/360)]5119.5044200.29ki
2028-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1073 / 360) ^ 2 + (1073 / 360)11.86[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1151.44]/[(1+24.77)^(1073/360)]+[(0.11 x (180/360)) x 92.00% x 100.00 x 1151.44]/[(1+24.77)^(1073/360)]7478.6188728.27ki
2028-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1253 / 360) ^ 2 + (1253 / 360)15.59[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1151.44]/[(1+24.77)^(1253/360)]+[(0.11 x (180/360)) x 84.50% x 100.00 x 1151.44]/[(1+24.77)^(1253/360)]6475.48100983.97ki
2029-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1433 / 360) ^ 2 + (1433 / 360)19.83[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1433/360)]+[(0.11 x (180/360)) x 77.00% x 100.00 x 1151.44]/[(1+24.77)^(1433/360)]7270.78144146.01ki
2029-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1613 / 360) ^ 2 + (1613 / 360)24.56[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1613/360)]+[(0.11 x (180/360)) x 66.00% x 100.00 x 1151.44]/[(1+24.77)^(1613/360)]6250.81153494.60ki
2030-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1793 / 360) ^ 2 + (1793 / 360)29.79[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1793/360)]+[(0.11 x (180/360)) x 55.00% x 100.00 x 1151.44]/[(1+24.77)^(1793/360)]5364.74159796.81ki
2030-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1973 / 360) ^ 2 + (1973 / 360)35.52[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(1973/360)]+[(0.11 x (180/360)) x 44.00% x 100.00 x 1151.44]/[(1+24.77)^(1973/360)]4595.70163225.83ki
2031-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2153 / 360) ^ 2 + (2153 / 360)41.75[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1151.44]/[(1+24.77)^(2153/360)]+[(0.11 x (180/360)) x 33.00% x 100.00 x 1151.44]/[(1+24.77)^(2153/360)]3928.91164022.45ki
2031-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2333 / 360) ^ 2 + (2333 / 360)48.48[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.22 x 100.00 x 1151.44]/[(1+24.77)^(2333/360)]+[(0.11 x (180/360)) x 22.00% x 100.00 x 1151.44]/[(1+24.77)^(2333/360)]6370.62308836.06ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [76600.00 x ((1 + 24.765) ^ 2)]] x 1399526.35]11.74
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2024-11-12
F. de Vencimiento2031-11-01
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl capital de las Nuevas Obligaciones Negociables será amortizado en 12 cuotas consecutivas en cada fecha deamortización especificada en la tabla a continuación y finalizando en la Fecha de Vencimiento (cada una, una ?Fecha deAmortización?). Las amortizaciones programadas de capital de las Nuevas Obligaciones Negociables en cada Fecha deAmortización serán por un monto igual al porcentaje del monto de capital de las Nuevas Obligaciones Negociables originalesemitidas en la Fecha de Emisión de las Nuevas Obligaciones Negociables, establecido a continuación frente a la Fecha deAmortización correspondiente (ajustado tras el rescate o recompra parcial de las Nuevas Obligaciones Negociables o la emisiónde Nuevas Obligaciones Negociables adicionales):1 de mayo de 2026 - 1.5%1 de noviembre de 2026 - 1.5%1 de mayo de 2027 - 2.5%1 de noviembre de 2027 - 2.5%1 de mayo de 2028 - 7.5%1 de novimebre de 2028 - 7.5%1 de mayo de 2029 - 11%1 de noviembre de 2029 - 11%1 de mayo de 2030 - 11%1 de noviembre de 2030 - 11%1 de mayo de 2031 - 11%1 de noviembre de 2031 - 22%
InteresTNA 11%
FrecuenciaLos intereses serán pagados semestralmente, en forma vencida, en las siguientes fechas: 1 de mayode 2025, 1 de noviembre de 2025, 1 de mayo de 2026, 1 de noviembre de 2026, 1 de mayo de 2027, 1 de noviembre de 2027, 1de mayo de 2028, 1 de noviembre de 2028, 1 de mayo de 2029, 1 de noviembre de 2029, 1 de mayo de 2030, 1 de noviembre de2030, 1 de mayo de 2031, y en la Fecha de Vencimiento, es decir, el 1 de noviembre de 2031
ISINUSP46214AG00
¿Ves algun dato que parece incorrecto?