2025-04-16100.00118318.004658.770.004658.77
2025-10-16100.00115144.004533.800.004533.80
2026-04-16100.00115144.004533.800.004533.80
2026-10-16100.00115144.004533.800.004533.80
2027-04-16100.00115144.004533.800.004533.80
2027-10-16100.00115144.004533.800.004533.80
2028-04-16100.00115144.004533.800.004533.80
2028-10-16100.00115144.004533.800.004533.80
2029-04-16100.00115144.004533.800.004533.80
2029-10-16100.00115144.004533.800.004533.80
2030-04-16100.00115144.004533.800.004533.80
2030-10-1667.0077146.484533.8037997.5242531.32
2031-04-1667.0077146.483037.640.003037.64
2031-10-1634.0039148.963037.6437997.5241035.16
2032-04-1634.0039148.961541.490.001541.49
2032-10-160.000.001541.4939148.9640690.45
Expresar en moneda de pago CCL
Datos
SimboloYFCJOValor Tecnico115698.13Semana TIR0.00%
EmisorYPF Energia Electrica S.A.YPF Energia Electrica S.A.Valor Residual100.00%Mes TIR-7.77%
TipoCorporativoParidad98.11%Semestre TIR9.02%
PaísArgentinaTIR8.43%1ero Enero TIR2.55%
MercadoBYMAMacaulay Dur.5.12Año TIRS/D
MonedaARSModified Dur.4.72Semana Precio-3.72%
Fecha/Hora2025-05-08 16:28:28Effective Dur.0.40Mes Precio-16.20%
Volumen83000Convexidad30.36Semestre Precio-1.52%
Precio113510.00Int. Corrido554.131ero Enero Precio-5.01%
Variación-1.08%Cupon4533.80Año PrecioS/D
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
124861.0010.00%6.45-23.51%
123725.909.00%6.64-21.29%
122590.808.00%6.82-19.04%
121455.707.00%7.02-16.76%
120320.606.00%7.21-14.46%
119185.505.00%7.41-12.12%
118050.404.00%7.61-9.76%
116915.303.00%7.81-7.37%
115780.202.00%8.01-4.94%
114645.101.00%8.22-2.47%
113510.000.00%8.430.00%
112374.90-1.00%8.642.54%
111239.80-2.00%8.865.11%
110104.70-3.00%9.087.71%
108969.60-4.00%9.3010.35%
107834.50-5.00%9.5313.02%
106699.40-6.00%9.7615.73%
105564.30-7.00%9.9918.48%
104429.20-8.00%10.2221.28%
103294.10-9.00%10.4624.11%
102159.00-10.00%10.7126.99%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
9.199.00%109544.34-3.49%
9.108.00%109976.18-3.11%
9.027.00%110410.35-2.73%
8.946.00%110846.86-2.35%
8.855.00%111285.72-1.96%
8.774.00%111726.96-1.57%
8.683.00%112170.58-1.18%
8.602.00%112616.61-0.79%
8.511.00%113065.06-0.39%
8.430.00%113510.000.00%
8.35-1.00%113969.270.40%
8.26-2.00%114425.060.81%
8.18-3.00%114883.341.21%
8.09-4.00%115344.111.62%
8.01-5.00%115807.402.02%
7.92-6.00%116273.212.43%
7.84-7.00%116741.572.85%
7.76-8.00%117212.503.26%
7.67-9.00%117686.003.68%
Desarrollo TIR
Desarrollo TIR 8.43%
FechaFormulaOperacionFactorTipo
2025-10-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(158/360)]4375.58i
2026-04-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(338/360)]4202.04i
2026-10-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(518/360)]4035.39i
2027-04-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(698/360)]3875.35i
2027-10-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(878/360)]3721.66i
2028-04-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1058/360)]3574.06i
2028-10-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1238/360)]3432.31i
2029-04-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1418/360)]3296.19i
2029-10-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1598/360)]3165.46i
2030-04-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1778/360)]3039.92i
2030-10-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1958/360)]2919.36i
2030-10-16[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.33 x 100.00 x 1151.44]/[(1+8.43)^(1958/360)]24467.03k
2031-04-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 67.00% x 100.00 x 1151.44]/[(1+8.43)^(2138/360)]1878.40i
2031-10-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 67.00% x 100.00 x 1151.44]/[(1+8.43)^(2318/360)]1803.90i
2031-10-16[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.33 x 100.00 x 1151.44]/[(1+8.43)^(2318/360)]22564.82k
2032-04-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 34.00% x 100.00 x 1151.44]/[(1+8.43)^(2498/360)]879.11i
2032-10-16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 34.00% x 100.00 x 1151.44]/[(1+8.43)^(2678/360)]844.24i
2032-10-16[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.34 x 100.00 x 1151.44]/[(1+8.43)^(2678/360)]21441.11k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-08(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL x (Dias Corridos / Dias entre Cupones)(0.07875 x (180/360)) x 1.00 x 1 x 100.00 x 1151.44 x (22/180)554.13
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-10-16(Dias para cupon / Dias Año)(158 / 360)0.44[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(158/360)]4375.540.040.02i
2026-04-16(Dias para cupon / Dias Año)(338 / 360)0.94[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(338/360)]4201.970.040.03i
2026-10-16(Dias para cupon / Dias Año)(518 / 360)1.44[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(518/360)]4035.280.040.05i
2027-04-16(Dias para cupon / Dias Año)(698 / 360)1.94[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(698/360)]3875.210.030.07i
2027-10-16(Dias para cupon / Dias Año)(878 / 360)2.44[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(878/360)]3721.490.030.08i
2028-04-16(Dias para cupon / Dias Año)(1058 / 360)2.94[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1058/360)]3573.860.030.09i
2028-10-16(Dias para cupon / Dias Año)(1238 / 360)3.44[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1238/360)]3432.090.030.10i
2029-04-16(Dias para cupon / Dias Año)(1418 / 360)3.94[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1418/360)]3295.950.030.11i
2029-10-16(Dias para cupon / Dias Año)(1598 / 360)4.44[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1598/360)]3165.200.030.12i
2030-04-16(Dias para cupon / Dias Año)(1778 / 360)4.94[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1778/360)]3039.650.030.13i
2030-10-16(Dias para cupon / Dias Año)(1958 / 360)5.44[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.33 x 100.00 x 1151.44]/[(1+8.43)^(1958/360)]+[(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1958/360)]27383.640.241.31ki
2031-04-16(Dias para cupon / Dias Año)(2138 / 360)5.94[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 67.00% x 100.00 x 1151.44]/[(1+8.43)^(2138/360)]1878.190.020.10i
2031-10-16(Dias para cupon / Dias Año)(2318 / 360)6.44[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.33 x 100.00 x 1151.44]/[(1+8.43)^(2318/360)]+[(0.07875 x (180/360)) x 67.00% x 100.00 x 1151.44]/[(1+8.43)^(2318/360)]24365.830.211.38ki
2032-04-16(Dias para cupon / Dias Año)(2498 / 360)6.94[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 34.00% x 100.00 x 1151.44]/[(1+8.43)^(2498/360)]879.000.010.05i
2032-10-16(Dias para cupon / Dias Año)(2678 / 360)7.44[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.34 x 100.00 x 1151.44]/[(1+8.43)^(2678/360)]+[(0.07875 x (180/360)) x 34.00% x 100.00 x 1151.44]/[(1+8.43)^(2678/360)]22282.300.201.46ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores5.125.12
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(5.12)/(1 + 8.43/100)4.72
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(113054.28 - 113958.59 )/( 2 x 113510 x 0.01)0.40
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-10-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](158 / 360) ^ 2 + (158 / 360)0.63[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(158/360)]4375.542763.21i
2026-04-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](338 / 360) ^ 2 + (338 / 360)1.82[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(338/360)]4201.977649.27i
2026-10-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](518 / 360) ^ 2 + (518 / 360)3.51[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(518/360)]4035.2814160.99i
2027-04-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](698 / 360) ^ 2 + (698 / 360)5.70[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(698/360)]3875.2122081.65i
2027-10-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](878 / 360) ^ 2 + (878 / 360)8.39[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(878/360)]3721.4931212.38i
2028-04-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1058 / 360) ^ 2 + (1058 / 360)11.58[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1058/360)]3573.8641370.89i
2028-10-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1238 / 360) ^ 2 + (1238 / 360)15.26[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1238/360)]3432.0952390.39i
2029-04-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1418 / 360) ^ 2 + (1418 / 360)19.45[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1418/360)]3295.9564118.52i
2029-10-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1598 / 360) ^ 2 + (1598 / 360)24.14[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1598/360)]3165.2076416.34i
2030-04-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1778 / 360) ^ 2 + (1778 / 360)29.33[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1778/360)]3039.6589157.42i
2030-10-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1958 / 360) ^ 2 + (1958 / 360)35.02[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.33 x 100.00 x 1151.44]/[(1+8.43)^(1958/360)]+[(0.07875 x (180/360)) x 100.00% x 100.00 x 1151.44]/[(1+8.43)^(1958/360)]27383.64958986.22ki
2031-04-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2138 / 360) ^ 2 + (2138 / 360)41.21[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 67.00% x 100.00 x 1151.44]/[(1+8.43)^(2138/360)]1878.1977399.03i
2031-10-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2318 / 360) ^ 2 + (2318 / 360)47.90[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.33 x 100.00 x 1151.44]/[(1+8.43)^(2318/360)]+[(0.07875 x (180/360)) x 67.00% x 100.00 x 1151.44]/[(1+8.43)^(2318/360)]24365.831167078.67ki
2032-04-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2498 / 360) ^ 2 + (2498 / 360)55.09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.07875 x (180/360)) x 34.00% x 100.00 x 1151.44]/[(1+8.43)^(2498/360)]879.0048421.33i
2032-10-16[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2678 / 360) ^ 2 + (2678 / 360)62.78[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.34 x 100.00 x 1151.44]/[(1+8.43)^(2678/360)]+[(0.07875 x (180/360)) x 34.00% x 100.00 x 1151.44]/[(1+8.43)^(2678/360)]22282.301398792.63ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [113510 x ((1 + 8.432) ^ 2)]] x 4051998.94]30.36
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2024-10-16
F. de Vencimiento2032-10-16
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl pago de capital respecto a las Obligaciones Negociables será amortizado en tres cuotas anuales consecutivas por un importe igual al porcentaje de capital de las Obligaciones Negociables que se indica a continuación frente a la fecha de pago correspondiente: 33% el 16 de octubre de 2030, 33% el 16 de octubre de 2031 y 34% el 16 de octubre de 2032
InteresTNA 7.875%
FrecuenciaLos Intereses serán pagados semestralmente en forma vencida en las siguientes fechas: el 16 de abril de 2025, 16 de octubre de 2025, 16 de abril de 2026, 16 de octubre de 2026, 16 de abril de 2027, 16 de octubre de 2027, 16 de abril de 2028, 16 de octubre de 2028, 16 de abril de 2029, 16 de octubre de 2029, 16 de abril de 2030, 16 de octubre de 2030, 16 de abril de 2031, 16 de octubre de 2031, 16 de abril de 2032 y en la Fecha de Vencimiento, es decir, el 16 de octubre de 2032