Pan American Energy. Clase XXXI. Tasa Fija 8.5% USD. Vto. 10-2032.
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2024-10-30100.00115502.004990.650.004990.65
2025-04-30100.00119787.005147.510.005147.51
2025-10-30100.00115144.004975.180.004975.18
2026-04-30100.00115144.004947.990.004947.99
2026-10-30100.00115144.004975.180.004975.18
2027-04-30100.00115144.004947.990.004947.99
2027-10-30100.00115144.004975.180.004975.18
2028-04-30100.00115144.004975.180.004975.18
2028-10-30100.00115144.004975.180.004975.18
2029-04-30100.00115144.004947.990.004947.99
2029-10-30100.00115144.004975.180.004975.18
2030-04-3066.6776762.714947.9938381.2943329.29
2030-10-3066.6776762.713316.790.003316.79
2031-04-3033.3338381.413298.6638381.2941679.96
2031-10-3033.3338381.411658.400.001658.40
2032-04-300.000.001658.4038381.2940039.69
Expresar en moneda de pago CCL
Datos
SimboloPNXCOValor Tecnico115361.49Semana TIR-1.37%
EmisorPan American Energy S.L.Pan American Energy S.L.Valor Residual100.00%Mes TIR-7.69%
TipoCorporativoParidad106.90%Semestre TIR-3.09%
PaísArgentinaTIR7.20%1ero Enero TIR0.14%
MercadoBYMAMacaulay Dur.4.89Año TIRS/D
MonedaARSModified Dur.4.56Semana Precio-3.28%
Fecha/Hora2025-05-08 16:30:07Effective Dur.0.33Mes Precio-16.79%
Volumen14000Convexidad28.29Semestre Precio0.18%
Precio123320.00Int. Corrido217.491ero Enero Precio-4.44%
Variación-1.82%Cupon4975.18Año PrecioS/D
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
135652.0010.00%5.14-28.57%
134418.809.00%5.34-25.89%
133185.608.00%5.53-23.16%
131952.407.00%5.73-20.40%
130719.206.00%5.93-17.60%
129486.005.00%6.14-14.77%
128252.804.00%6.34-11.90%
127019.603.00%6.55-8.99%
125786.402.00%6.76-6.05%
124553.201.00%6.98-3.07%
123320.000.00%7.200.00%
122086.80-1.00%7.423.02%
120853.60-2.00%7.646.13%
119620.40-3.00%7.879.29%
118387.20-4.00%8.1012.48%
117154.00-5.00%8.3315.73%
115920.80-6.00%8.5719.01%
114687.60-7.00%8.8122.35%
113454.40-8.00%9.0525.74%
112221.20-9.00%9.3029.18%
110988.00-10.00%9.5532.67%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
7.859.00%119728.52-2.91%
7.788.00%120118.36-2.60%
7.707.00%120509.94-2.28%
7.636.00%120903.26-1.96%
7.565.00%121298.33-1.64%
7.494.00%121695.16-1.32%
7.423.00%122093.76-0.99%
7.342.00%122494.14-0.67%
7.271.00%122896.31-0.34%
7.200.00%123320.000.00%
7.13-1.00%123706.060.31%
7.06-2.00%124113.650.64%
6.98-3.00%124523.070.98%
6.91-4.00%124934.331.31%
6.84-5.00%125347.441.64%
6.77-6.00%125762.411.98%
6.70-7.00%126179.242.32%
6.62-8.00%126597.952.66%
6.55-9.00%127018.543.00%
Desarrollo TIR
Desarrollo TIR 7.20%
FechaFormulaOperacionFactorTipo
2025-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(175/360)]4809.84i
2026-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(357/360)]4618.34i
2026-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(540/360)]4482.46i
2027-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(722/360)]4304.00i
2027-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(905/360)]4177.37i
2028-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1088/360)]4032.31i
2028-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1271/360)]3892.28i
2029-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1453/360)]3737.31i
2029-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1636/360)]3627.36i
2030-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1818/360)]3482.94i
2030-04-30[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1151.44]/[(1+7.20)^(1818/360)]27016.93k
2030-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 66.67% x 100.00 x 1151.44]/[(1+7.20)^(2001/360)]2253.64i
2031-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 66.67% x 100.00 x 1151.44]/[(1+7.20)^(2183/360)]2163.92i
2031-04-30[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1151.44]/[(1+7.20)^(2183/360)]25178.03k
2031-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 33.33% x 100.00 x 1151.44]/[(1+7.20)^(2366/360)]1050.13i
2032-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 33.33% x 100.00 x 1151.44]/[(1+7.20)^(2549/360)]1013.66i
2032-04-30[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1151.44]/[(1+7.20)^(2549/360)]23459.77k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-08(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL x (Dias Corridos / Dias entre Cupones)(0.085 x (183/360)) x 1.00 x 1 x 100.00 x 1151.44 x (8/183)217.49
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-10-30(Dias para cupon / Dias Año)(175 / 360)0.49[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(175/360)]4809.910.040.02i
2026-04-30(Dias para cupon / Dias Año)(357 / 360)0.99[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(357/360)]4618.480.040.04i
2026-10-30(Dias para cupon / Dias Año)(540 / 360)1.50[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(540/360)]4482.670.040.05i
2027-04-30(Dias para cupon / Dias Año)(722 / 360)2.01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(722/360)]4304.260.030.07i
2027-10-30(Dias para cupon / Dias Año)(905 / 360)2.51[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(905/360)]4177.690.030.09i
2028-04-30(Dias para cupon / Dias Año)(1088 / 360)3.02[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1088/360)]4032.680.030.10i
2028-10-30(Dias para cupon / Dias Año)(1271 / 360)3.53[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1271/360)]3892.710.030.11i
2029-04-30(Dias para cupon / Dias Año)(1453 / 360)4.04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1453/360)]3737.780.030.12i
2029-10-30(Dias para cupon / Dias Año)(1636 / 360)4.54[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1636/360)]3627.870.030.13i
2030-04-30(Dias para cupon / Dias Año)(1818 / 360)5.05[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1151.44]/[(1+7.20)^(1818/360)]+[(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1818/360)]30504.620.251.25ki
2030-10-30(Dias para cupon / Dias Año)(2001 / 360)5.56[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 66.67% x 100.00 x 1151.44]/[(1+7.20)^(2001/360)]2254.030.020.10i
2031-04-30(Dias para cupon / Dias Año)(2183 / 360)6.06[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1151.44]/[(1+7.20)^(2183/360)]+[(0.085 x (182/360)) x 66.67% x 100.00 x 1151.44]/[(1+7.20)^(2183/360)]27347.070.221.34ki
2031-10-30(Dias para cupon / Dias Año)(2366 / 360)6.57[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 33.33% x 100.00 x 1151.44]/[(1+7.20)^(2366/360)]1050.340.010.06i
2032-04-30(Dias para cupon / Dias Año)(2549 / 360)7.08[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1151.44]/[(1+7.20)^(2549/360)]+[(0.085 x (183/360)) x 33.33% x 100.00 x 1151.44]/[(1+7.20)^(2549/360)]24478.790.201.41ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores4.894.89
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(4.89)/(1 + 7.20/100)4.56
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(122915.04 - 123724.58 )/( 2 x 123320 x 0.01)0.33
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](175 / 360) ^ 2 + (175 / 360)0.72[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(175/360)]4809.913474.75i
2026-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](357 / 360) ^ 2 + (357 / 360)1.98[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(357/360)]4618.489121.82i
2026-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](540 / 360) ^ 2 + (540 / 360)3.75[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(540/360)]4482.6716810.01i
2027-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](722 / 360) ^ 2 + (722 / 360)6.03[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(722/360)]4304.2625945.27i
2027-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](905 / 360) ^ 2 + (905 / 360)8.83[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(905/360)]4177.6936903.74i
2028-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1088 / 360) ^ 2 + (1088 / 360)12.16[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1088/360)]4032.6849021.49i
2028-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1271 / 360) ^ 2 + (1271 / 360)16.00[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1271/360)]3892.7162265.34i
2029-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1453 / 360) ^ 2 + (1453 / 360)20.33[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1453/360)]3737.7875975.26i
2029-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1636 / 360) ^ 2 + (1636 / 360)25.20[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1636/360)]3627.8791409.25i
2030-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1818 / 360) ^ 2 + (1818 / 360)30.55[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1151.44]/[(1+7.20)^(1818/360)]+[(0.085 x (182/360)) x 100.00% x 100.00 x 1151.44]/[(1+7.20)^(1818/360)]30504.62931992.50ki
2030-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2001 / 360) ^ 2 + (2001 / 360)36.45[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 66.67% x 100.00 x 1151.44]/[(1+7.20)^(2001/360)]2254.0382167.06i
2031-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2183 / 360) ^ 2 + (2183 / 360)42.83[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1151.44]/[(1+7.20)^(2183/360)]+[(0.085 x (182/360)) x 66.67% x 100.00 x 1151.44]/[(1+7.20)^(2183/360)]27347.071171401.92ki
2031-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2366 / 360) ^ 2 + (2366 / 360)49.77[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 33.33% x 100.00 x 1151.44]/[(1+7.20)^(2366/360)]1050.3452271.55i
2032-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2549 / 360) ^ 2 + (2549 / 360)57.21[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1151.44]/[(1+7.20)^(2549/360)]+[(0.085 x (183/360)) x 33.33% x 100.00 x 1151.44]/[(1+7.20)^(2549/360)]24478.791400549.45ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [123320 x ((1 + 7.1966875000001) ^ 2)]] x 4009309.40]28.29
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2024-04-30
F. de Vencimiento2032-04-30
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl capital de las Obligaciones Negociables será amortizado en tres (3) cuotas anuales, según se detalla a continuación: (i) el 30 de abril de 2030, es decir en la fecha en que se cumplan 6 (seis) años contados desde la Fecha de Emisión y Liquidación, una suma equivalente a US$133.333.000, (ii) el 30 de abril de 2031, es decir en la fecha en que se cumplan 7 (siete) años contados desde la Fecha de Emisión y Liquidación, una suma equivalente a US$133.333.000, y (iii) en la Fecha de Vencimiento, una suma equivalente a US$133.334.000.
InteresTNA 8.5%
FrecuenciaSerán los días 30 de abril y 30 de octubre de cada año, comenzando el 30 de octubre de 2024, y finalizando en la Fecha de Vencimiento.
ISINUSE7S78BAC65
¿Ves algun dato que parece incorrecto?