Fecha | Valor Residual | Cap.Actualizado | Interes | Capital | Cupon |
---|---|---|---|---|---|
2025-06-30 | 0.00 | 0.00 | 0.00 | 111750.00 | 111750.00 |
Datos | |||||
---|---|---|---|---|---|
Simbolo | TZV25 | Valor Tecnico | 111750.00 | Semana TIR | 20.29% |
Emisor | ArgentinaArgentina | Valor Residual | 100.00% | Mes TIR | 215.44% |
Tipo | Soberano | Paridad | 97.55% | Semestre TIR | 492.01% |
País | Argentina | TIR | 19.15% | 1ero Enero TIR | 4068.91% |
Mercado | BYMA | Macaulay Dur. | 0.14 | Año TIR | 454.54% |
Moneda | ARS | Modified Dur. | 0.12 | Semana Precio | -4.67% |
Fecha/Hora | 2025-05-09 13:04:09 | Effective Dur. | 0.02 | Mes Precio | -2.84% |
Volumen | 1031068 | Convexidad | 0.11 | Semestre Precio | 11.58% |
Precio | 109010.00 | Int. Corrido | 0.00 | 1ero Enero Precio | 5.32% |
Variación | -0.63% | Cupon | 111750.00 | Año Precio | 15.97% |
Sensibilidad Precio | |||
---|---|---|---|
Precio | Variación Precio | TIR | Variación TIR |
119911.00 | 10.00% | -39.20 | -379.18% |
118820.90 | 9.00% | -35.15 | -350.34% |
117730.80 | 8.00% | -30.79 | -319.30% |
116640.70 | 7.00% | -26.09 | -285.84% |
115550.60 | 6.00% | -21.03 | -249.77% |
114460.50 | 5.00% | -15.56 | -210.84% |
113370.40 | 4.00% | -9.66 | -168.82% |
112280.30 | 3.00% | -3.29 | -123.41% |
111190.20 | 2.00% | 3.61 | -74.30% |
110100.10 | 1.00% | 11.07 | -21.15% |
109010.00 | 0.00% | 19.15 | 0.00% |
107919.90 | -1.00% | 27.91 | 98.81% |
106829.80 | -2.00% | 37.42 | 166.50% |
105739.70 | -3.00% | 47.73 | 239.98% |
104649.60 | -4.00% | 58.95 | 319.84% |
103559.50 | -5.00% | 71.14 | 406.69% |
102469.40 | -6.00% | 84.41 | 501.23% |
101379.30 | -7.00% | 98.87 | 604.23% |
100289.20 | -8.00% | 114.64 | 716.55% |
99199.10 | -9.00% | 131.86 | 839.16% |
98109.00 | -10.00% | 150.67 | 973.13% |
Sensibilidad TIR | |||
---|---|---|---|
TIR | Variación TIR | Precio | Variación Precio |
14.04 | 0.00% | 109010.00 | 0.00% |
15.30 | 9.00% | 109518.24 | 0.47% |
15.16 | 8.00% | 109537.15 | 0.48% |
15.02 | 7.00% | 109556.08 | 0.50% |
14.88 | 6.00% | 109575.04 | 0.52% |
14.74 | 5.00% | 109594.02 | 0.54% |
14.60 | 4.00% | 109613.03 | 0.55% |
14.46 | 3.00% | 109632.07 | 0.57% |
14.32 | 2.00% | 109651.13 | 0.59% |
14.18 | 1.00% | 109670.22 | 0.61% |
13.90 | -1.00% | 109708.49 | 0.64% |
13.76 | -2.00% | 109727.66 | 0.66% |
13.62 | -3.00% | 109746.86 | 0.68% |
13.48 | -4.00% | 109766.08 | 0.69% |
13.34 | -5.00% | 109785.33 | 0.71% |
13.20 | -6.00% | 109804.61 | 0.73% |
13.06 | -7.00% | 109823.92 | 0.75% |
12.92 | -8.00% | 109843.26 | 0.76% |
12.78 | -9.00% | 109862.62 | 0.78% |
Desarrollo TIR 19.15% | ||||
---|---|---|---|---|
Fecha | Formula | Operacion | Factor | Tipo |
2025-06-30 | [(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0 x (482/360)) x 1117.5000 x 100.00% x 100.00]/[(1+19.15)^(51/360)] | 0.00 | i |
2025-06-30 | [Dolar x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [1117.5000 x 1 x 100.00]/[(1+19.15)^(51/360)] | 109010.30 | k |
Desarrollo Interes Corrido | Fecha | Formula | Operacion | Interes Corrido |
---|---|---|---|
2025-05-09 | (TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones) | (0 x (482/360)) x 1117.50 x 1 x 100.00 x (431/482) | 0.00 |
Desarrollo Duracion Macaulay | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Fecha | Per. Ponderados Formula | Per. Pond. Operacion | Periodos Ponderados | Factor Formula | Factor Operacion | Factor | Factor/Precio | Factor/Precio x Num. Periodos | Cap. o Int. | |
2025-06-30 | (Dias para cupon / Dias Año) | (51 / 360) | 0.14 | [Dolar x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [1117.5000 x 1 x 100.00]/[(1+19.15)^(51/360)]+[(0 x (482/360)) x 1117.5000 x 100.00% x 100.00]/[(1+19.15)^(51/360)] | 109009.90 | 1.00 | 0.14 | ki |
Desarrollo Duracion Macaulay Valor Final | |||||||||
---|---|---|---|---|---|---|---|---|---|
Formula | Operacion | Duracion Macaulay | |||||||
Suma Factores | 0.14 | 0.14 |
Desarrollo Duracion Modificada | ||
---|---|---|
Formula | Operacion | Duracion Modificada |
(Macaulay Duration)/(1 + TIR) | (0.14)/(1 + 19.15/100) | 0.12 |
Desarrollo Duracion Efectiva | ||
---|---|---|
Formula | Operacion | Duracion Efectiva |
(P+ - P-)/(2 x Po x ΔTIR) | (108985.10 - 109034.74 )/( 2 x 109010 x 0.01) | 0.02 |
Desarrollo Convexidad Suma Factores | ||||||||
---|---|---|---|---|---|---|---|---|
Fecha | Formula n2+n | Operacion n2+n | Factor n2+n | Formula VAN | Operacion VAN | Factor VAN | Formula n2+n X Factor VAN | Cap. o Int. |
2025-06-30 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (51 / 360) ^ 2 + (51 / 360) | 0.16 | [Dolar x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [1117.5000 x 1 x 100.00]/[(1+19.15)^(51/360)]+[(0 x (482/360)) x 1117.5000 x 100.00% x 100.00]/[(1+19.15)^(51/360)] | 109009.90 | 17630.84 | ki |
Formula Convexidad Valor Final | ||
---|---|---|
Formula | Operacion | Convexidad |
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores] | [1 / [109010 x ((1 + 19.153125) ^ 2)]] x 17630.84] | 0.11 |
F. de Emision | 2024-02-28 | ||
F. de Vencimiento | 2025-06-30 | ||
Ajuste | Dolar Linked | ||
Dias previos para calculo ajuste o interes | 3 | ||
Capital | Integra al vencimiento al tipo de cambio aplicable. | ||
Interes | Cero Cupon | ||
Frecuencia | Cero Cupon | ||
ISIN | AR0611241768 |