Oleoductos del Valle. Clase II. Dolar Linked. Tasa 1%. Vto. 06-2028
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2023-12-09100.0036441.0090.850.0090.85
2024-03-09100.0084675.00211.110.00211.11
2024-06-09100.0089908.00226.620.00226.62
2024-09-09100.0095775.00241.410.00241.41
2024-12-09100.00101675.00253.490.00253.49
2025-03-09100.00106604.00262.860.00262.86
2025-06-09100.00111358.00280.680.00280.68
2025-09-09100.00111358.00280.680.00280.68
2025-12-09100.00111358.00277.630.00277.63
2026-03-09100.00111358.00274.580.00274.58
2026-06-09100.00111358.00280.680.00280.68
2026-09-09100.00111358.00280.680.00280.68
2026-12-09100.00111358.00277.630.00277.63
2027-03-09100.00111358.00274.580.00274.58
2027-06-09100.00111358.00280.680.00280.68
2027-09-09100.00111358.00280.680.00280.68
2027-12-09100.00111358.00277.630.00277.63
2028-03-09100.00111358.00277.630.00277.63
2028-06-090.000.00280.68111358.00111638.68
Datos
SimboloOLC2OValor Tecnico111544.11Semana TIR-14.91%
EmisorOleoductos del Valle S.A. Oleoductos del Valle S.A. Valor Residual100.00%Mes TIR19.85%
TipoCorporativoParidad78.98%Semestre TIR13.83%
PaísArgentinaTIR9.17%1ero Enero TIR-2.72%
MercadoBYMAMacaulay Dur.3.03Año TIR154.79%
MonedaARSModified Dur.2.78Semana Precio0.00%
Fecha/Hora2025-03-10 13:55:09Effective Dur.0.25Mes Precio0.00%
Volumen0Convexidad10.35Semestre Precio12.23%
Precio88100.00Int. Corrido186.111ero Enero Precio12.23%
Variación0.00%Cupon280.68Año Precio10.54%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
96910.0010.00%5.79-36.84%
96029.009.00%6.11-33.37%
95148.008.00%6.43-29.84%
94267.007.00%6.76-26.28%
93386.006.00%7.09-22.67%
92505.005.00%7.43-19.01%
91624.004.00%7.77-15.31%
90743.003.00%8.11-11.56%
89862.002.00%8.46-7.76%
88981.001.00%8.81-3.91%
88100.000.00%9.170.00%
87219.00-1.00%9.533.94%
86338.00-2.00%9.907.96%
85457.00-3.00%10.2712.02%
84576.00-4.00%10.6516.13%
83695.00-5.00%11.0320.31%
82814.00-6.00%11.4224.56%
81933.00-7.00%11.8228.85%
81052.00-8.00%12.2233.22%
80171.00-9.00%12.6237.64%
79290.00-10.00%13.0342.13%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
10.009.00%86108.46-2.26%
9.908.00%86326.34-2.01%
9.817.00%86544.97-1.77%
9.726.00%86764.34-1.52%
9.635.00%86984.46-1.27%
9.544.00%87205.33-1.02%
9.453.00%87426.95-0.76%
9.352.00%87649.33-0.51%
9.261.00%87872.47-0.26%
9.170.00%88100.000.00%
9.08-1.00%88321.040.25%
8.99-2.00%88546.480.51%
8.89-3.00%88772.700.76%
8.80-4.00%88999.691.02%
8.71-5.00%89227.461.28%
8.62-6.00%89456.011.54%
8.53-7.00%89685.351.80%
8.44-8.00%89915.482.06%
8.34-9.00%90146.412.32%
Desarrollo TIR
Desarrollo TIR 9.17%
FechaFormulaOperacionFactorTipo
2025-06-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(31/365)]278.60i
2025-09-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(123/365)]272.51i
2025-12-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(214/365)]263.71i
2026-03-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (90/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(304/365)]255.23i
2026-06-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(396/365)]255.20i
2026-09-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(488/365)]249.62i
2026-12-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(579/365)]241.56i
2027-03-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (90/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(669/365)]233.79i
2027-06-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(761/365)]233.76i
2027-09-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(853/365)]228.65i
2027-12-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(944/365)]221.27i
2028-03-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(1035/365)]216.48i
2028-06-09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(1127/365)]214.07i
2028-06-09[Dolar x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1113.5800 x 1 x 100.00]/[(1+9.17)^(1127/365)]84931.92k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-09(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones)(0.01 x (92/365)) x 1113.58 x 1 x 100.00 x (61/92)186.11
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-06-09(Dias para cupon / Dias Año)(31 / 365)0.08[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(31/365)]278.600.000.00i
2025-09-09(Dias para cupon / Dias Año)(123 / 365)0.34[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(123/365)]272.510.000.00i
2025-12-09(Dias para cupon / Dias Año)(214 / 365)0.59[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(214/365)]263.710.000.00i
2026-03-09(Dias para cupon / Dias Año)(304 / 365)0.83[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (90/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(304/365)]255.230.000.00i
2026-06-09(Dias para cupon / Dias Año)(396 / 365)1.08[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(396/365)]255.200.000.00i
2026-09-09(Dias para cupon / Dias Año)(488 / 365)1.34[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(488/365)]249.620.000.00i
2026-12-09(Dias para cupon / Dias Año)(579 / 365)1.59[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(579/365)]241.570.000.00i
2027-03-09(Dias para cupon / Dias Año)(669 / 365)1.83[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (90/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(669/365)]233.800.000.00i
2027-06-09(Dias para cupon / Dias Año)(761 / 365)2.08[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(761/365)]233.770.000.01i
2027-09-09(Dias para cupon / Dias Año)(853 / 365)2.34[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(853/365)]228.660.000.01i
2027-12-09(Dias para cupon / Dias Año)(944 / 365)2.59[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(944/365)]221.280.000.01i
2028-03-09(Dias para cupon / Dias Año)(1035 / 365)2.84[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(1035/365)]216.490.000.01i
2028-06-09(Dias para cupon / Dias Año)(1127 / 365)3.09[Dolar x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1113.5800 x 1 x 100.00]/[(1+9.17)^(1127/365)]+[(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(1127/365)]85149.150.972.98ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores3.033.03
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(3.03)/(1 + 9.17/100)2.78
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(87875.70 - 88324.23 )/( 2 x 88100.00 x 0.01)0.25
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-06-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](31 / 365) ^ 2 + (31 / 365)0.09[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(31/365)]278.6025.67i
2025-09-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](123 / 365) ^ 2 + (123 / 365)0.45[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(123/365)]272.51122.78i
2025-12-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](214 / 365) ^ 2 + (214 / 365)0.93[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(214/365)]263.71245.27i
2026-03-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](304 / 365) ^ 2 + (304 / 365)1.53[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (90/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(304/365)]255.23389.63i
2026-06-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](396 / 365) ^ 2 + (396 / 365)2.26[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(396/365)]255.20577.27i
2026-09-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](488 / 365) ^ 2 + (488 / 365)3.12[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(488/365)]249.62779.94i
2026-12-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](579 / 365) ^ 2 + (579 / 365)4.10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(579/365)]241.57991.06i
2027-03-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](669 / 365) ^ 2 + (669 / 365)5.19[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (90/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(669/365)]233.801213.96i
2027-06-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](761 / 365) ^ 2 + (761 / 365)6.43[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(761/365)]233.771503.56i
2027-09-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](853 / 365) ^ 2 + (853 / 365)7.80[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(853/365)]228.661783.17i
2027-12-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](944 / 365) ^ 2 + (944 / 365)9.28[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(944/365)]221.282052.40i
2028-03-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1035 / 365) ^ 2 + (1035 / 365)10.88[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (91/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(1035/365)]216.492354.62i
2028-06-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1127 / 365) ^ 2 + (1127 / 365)12.62[Dolar x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1113.5800 x 1 x 100.00]/[(1+9.17)^(1127/365)]+[(0.01 x (92/365)) x 1113.5800 x 100.00% x 100.00]/[(1+9.17)^(1127/365)]85149.151074700.23ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [88100.00 x ((1 + 9.1686874999999) ^ 2)]] x 1086739.56]10.35
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2023-06-09
F. de Vencimiento2028-06-09
AjusteDolar Linked
Dias previos para calculo ajuste o interes3
Capital El capital de las Obligaciones Negociables Clase 2 será amortizado en un único pago en la Fecha de Vencimiento. El monto de capital será pagadero en Pesos al Tipo de Cambio Aplicable.
InteresTasa de interes 1%
Frecuencia: Los intereses serán pagados trimestralmente, en forma vencida, en las siguientes fechas: (i) 9 de septiembre de 2023, (ii) 9 de diciembre de 2023; (iii) 9 de marzo de 2024; (iv) 9 de junio de 2024; (v) 9 de septiembre de 2024; (vi) 9 de diciembre de 2024; (vii) 9 de marzo de 2025; (viii) 9 de junio de 2025; (ix) 9 de septiembre de 2025; (x) 9 de diciembre de 2025; (xi) 9 de marzo de 2026; (xii) 9 de junio de 2026; (xiii) 9 de septiembre de 2026; (xiv) 9 de diciembre de 2026; (xv) 9 de marzo de 2027; (xvi) 9 de junio de 2027; (xvii) 9 de septiembre de 2027; (xviii) 9 de diciembre de 2027; (xix) 9 de marzo de 2028; y (xx) en la Fecha de Vencimiento de las Obligaciones Negociables Clase 2
ISINSin Datos
¿Ves algun dato que parece incorrecto?