Fecha | Valor Residual | Cap.Actualizado | Interes | Capital | Cupon |
---|---|---|---|---|---|
2021-05-09 | 100.00 | 130.90 | 1.78 | 0.00 | 1.78 |
2021-11-09 | 100.00 | 159.92 | 1.60 | 0.00 | 1.60 |
2022-05-09 | 100.00 | 200.15 | 2.00 | 0.00 | 2.00 |
2022-11-09 | 100.00 | 287.83 | 2.88 | 0.00 | 2.88 |
2023-05-09 | 100.00 | 406.16 | 4.06 | 0.00 | 4.06 |
2023-11-09 | 100.00 | 658.96 | 6.59 | 0.00 | 6.59 |
2024-05-09 | 100.00 | 1542.55 | 15.43 | 0.00 | 15.43 |
2024-11-09 | 80.00 | 1724.80 | 21.56 | 431.20 | 452.76 |
2025-05-09 | 60.00 | 1509.83 | 20.13 | 503.28 | 523.41 |
2025-11-09 | 40.00 | 1006.55 | 15.10 | 503.28 | 518.37 |
2026-05-09 | 20.00 | 503.28 | 10.07 | 503.28 | 513.34 |
2026-11-09 | 0.00 | 0.00 | 5.03 | 503.28 | 508.31 |
Datos | |||||
---|---|---|---|---|---|
Simbolo | TX26 | Valor Tecnico | 1509.83 | Semana TIR | -23.54% |
Emisor | ArgentinaArgentina | Valor Residual | 60.00% | Mes TIR | -21.29% |
Tipo | Soberano | Paridad | 94.98% | Semestre TIR | -83.49% |
País | Argentina | TIR | 7.47% | 1ero Enero TIR | -22.67% |
Mercado | BYMA | Macaulay Dur. | 0.98 | Año TIR | 246.47% |
Moneda | ARS | Modified Dur. | 0.92 | Semana Precio | -24.63% |
Fecha/Hora | 2025-05-09 12:45:03 | Effective Dur. | 0.07 | Mes Precio | -23.11% |
Volumen | 71309158 | Convexidad | 1.84 | Semestre Precio | -9.33% |
Precio | 1434.00 | Int. Corrido | 0.00 | 1ero Enero Precio | -14.54% |
Variación | 0.53% | Cupon | 518.37 | Año Precio | -16.58% |
Sensibilidad Precio | |||
---|---|---|---|
Precio | Variación Precio | TIR | Variación TIR |
1577.40 | 10.00% | -2.37 | -132.10% |
1563.06 | 9.00% | -1.48 | -119.98% |
1548.72 | 8.00% | -0.56 | -107.62% |
1534.38 | 7.00% | 0.37 | -95.00% |
1520.04 | 6.00% | 1.32 | -82.12% |
1505.70 | 5.00% | 2.29 | -68.99% |
1491.36 | 4.00% | 3.28 | -55.57% |
1477.02 | 3.00% | 4.30 | -41.88% |
1462.68 | 2.00% | 5.33 | -27.87% |
1448.34 | 1.00% | 6.39 | -13.58% |
1434.00 | 0.00% | 7.47 | 0.00% |
1419.66 | -1.00% | 8.57 | 15.95% |
1405.32 | -2.00% | 9.70 | 31.22% |
1390.98 | -3.00% | 10.85 | 46.83% |
1376.64 | -4.00% | 12.03 | 62.80% |
1362.30 | -5.00% | 13.24 | 79.13% |
1347.96 | -6.00% | 14.47 | 95.85% |
1333.62 | -7.00% | 15.74 | 112.97% |
1319.28 | -8.00% | 17.03 | 130.49% |
1304.94 | -9.00% | 18.36 | 148.45% |
1290.60 | -10.00% | 19.72 | 166.84% |
Sensibilidad TIR | |||
---|---|---|---|
TIR | Variación TIR | Precio | Variación Precio |
8.06 | 9.00% | 1426.29 | -0.54% |
7.98 | 8.00% | 1427.25 | -0.47% |
7.91 | 7.00% | 1428.22 | -0.40% |
7.83 | 6.00% | 1429.18 | -0.34% |
7.76 | 5.00% | 1430.14 | -0.27% |
7.69 | 4.00% | 1431.11 | -0.20% |
7.61 | 3.00% | 1432.08 | -0.13% |
7.54 | 2.00% | 1433.05 | -0.07% |
7.39 | 0.00% | 1434.00 | 0.00% |
7.46 | 1.00% | 1434.02 | 0.00% |
7.32 | -1.00% | 1435.96 | 0.14% |
7.24 | -2.00% | 1436.94 | 0.20% |
7.17 | -3.00% | 1437.91 | 0.27% |
7.09 | -4.00% | 1438.89 | 0.34% |
7.02 | -5.00% | 1439.87 | 0.41% |
6.95 | -6.00% | 1440.85 | 0.48% |
6.87 | -7.00% | 1441.83 | 0.55% |
6.80 | -8.00% | 1442.82 | 0.61% |
6.72 | -9.00% | 1443.80 | 0.68% |
Desarrollo TIR 7.47% | ||||
---|---|---|---|---|
Fecha | Formula | Operacion | Factor | Tipo |
2025-11-09 | [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.02 x (180/360)) x 25.1638 x 60.00% x 100.00]/[(1+7.47)^(180/360)] | 14.56 | i |
2025-11-09 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.1638 x 0.2 x 100.00]/[(1+7.47)^(180/360)] | 485.47 | k |
2026-05-09 | [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.02 x (180/360)) x 25.1638 x 40.00% x 100.00]/[(1+7.47)^(360/360)] | 9.37 | i |
2026-05-09 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.1638 x 0.2 x 100.00]/[(1+7.47)^(360/360)] | 468.29 | k |
2026-11-09 | [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.02 x (180/360)) x 25.1638 x 20.00% x 100.00]/[(1+7.47)^(540/360)] | 4.52 | i |
2026-11-09 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.1638 x 0.2 x 100.00]/[(1+7.47)^(540/360)] | 451.73 | k |
Desarrollo Interes Corrido | Fecha | Formula | Operacion | Interes Corrido |
---|---|---|---|
2025-05-09 | (TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones) | (0.02 x (180/360)) x 25.16 x 0.6 x 100.00 x (0/180) | 0.00 |
Desarrollo Duracion Macaulay | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Fecha | Per. Ponderados Formula | Per. Pond. Operacion | Periodos Ponderados | Factor Formula | Factor Operacion | Factor | Factor/Precio | Factor/Precio x Num. Periodos | Cap. o Int. | |
2025-11-09 | (Dias para cupon / Dias Año) | (180 / 360) | 0.50 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.1638 x 0.2 x 100.00]/[(1+7.47)^(180/360)]+[(0.02 x (180/360)) x 25.1638 x 60.00% x 100.00]/[(1+7.47)^(180/360)] | 500.04 | 0.35 | 0.17 | ki | |
2026-05-09 | (Dias para cupon / Dias Año) | (360 / 360) | 1.00 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.1638 x 0.2 x 100.00]/[(1+7.47)^(360/360)]+[(0.02 x (180/360)) x 25.1638 x 40.00% x 100.00]/[(1+7.47)^(360/360)] | 477.68 | 0.33 | 0.33 | ki | |
2026-11-09 | (Dias para cupon / Dias Año) | (540 / 360) | 1.50 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.1638 x 0.2 x 100.00]/[(1+7.47)^(540/360)]+[(0.02 x (180/360)) x 25.1638 x 20.00% x 100.00]/[(1+7.47)^(540/360)] | 456.27 | 0.32 | 0.48 | ki |
Desarrollo Duracion Macaulay Valor Final | |||||||||
---|---|---|---|---|---|---|---|---|---|
Formula | Operacion | Duracion Macaulay | |||||||
Suma Factores | 0.98 | 0.98 |
Desarrollo Duracion Modificada | ||
---|---|---|
Formula | Operacion | Duracion Modificada |
(Macaulay Duration)/(1 + TIR) | (0.98)/(1 + 7.47/100) | 0.92 |
Desarrollo Duracion Efectiva | ||
---|---|---|
Formula | Operacion | Duracion Efectiva |
(P+ - P-)/(2 x Po x ΔTIR) | (1433.01 - 1434.97 )/( 2 x 1434 x 0.01) | 0.07 |
Desarrollo Convexidad Suma Factores | ||||||||
---|---|---|---|---|---|---|---|---|
Fecha | Formula n2+n | Operacion n2+n | Factor n2+n | Formula VAN | Operacion VAN | Factor VAN | Formula n2+n X Factor VAN | Cap. o Int. |
2025-11-09 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (180 / 360) ^ 2 + (180 / 360) | 0.75 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.1638 x 0.2 x 100.00]/[(1+7.47)^(180/360)]+[(0.02 x (180/360)) x 25.1638 x 60.00% x 100.00]/[(1+7.47)^(180/360)] | 500.04 | 375.03 | ki |
2026-05-09 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (360 / 360) ^ 2 + (360 / 360) | 2.00 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.1638 x 0.2 x 100.00]/[(1+7.47)^(360/360)]+[(0.02 x (180/360)) x 25.1638 x 40.00% x 100.00]/[(1+7.47)^(360/360)] | 477.68 | 955.36 | ki |
2026-11-09 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (540 / 360) ^ 2 + (540 / 360) | 3.75 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.1638 x 0.2 x 100.00]/[(1+7.47)^(540/360)]+[(0.02 x (180/360)) x 25.1638 x 20.00% x 100.00]/[(1+7.47)^(540/360)] | 456.27 | 1711.01 | ki |
Formula Convexidad Valor Final | ||
---|---|---|
Formula | Operacion | Convexidad |
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores] | [1 / [1434 x ((1 + 7.466) ^ 2)]] x 3041.40] | 1.84 |
Desarrollo CER | |||
---|---|---|---|
Fecha | CER | ||
2020-08-21 | 22.5440 | ||
2025-04-25 | 567.2924 | ||
    | |||
CER Final/ CER Inicial | 25.1638 |
F. de Emision | 2020-09-04 | ||
F. de Vencimiento | 2026-11-09 | ||
Ajuste | CER | ||
Dias previos para calculo ajuste o interes | 10 | ||
Capital | La amortización se efectuará en CINCO (5) cuotas semestrales iguales el 9 de mayo y el 9 de noviembre de cada año, con la primera cuota el 9 de noviembre de 2024 y la última cuota el 9 de noviembre de 2026 | ||
Interes | Los BONOS DEL TESORO NACIONAL EN PESOS CON AJUSTE POR CER 2,00% VTO. 2026 (BONCER 2026 2,00%) devengarán intereses, a partir del 4 de septiembre de 2020, sobre la base de un año de TRESCIENTOS SESENTA (360) días integrado por DOCE (12) meses de TREINTA (30) días cada uno, a una tasa de DOS POR CIENTO (2,00%). | ||
Frecuencia | Las fechas de pago de intereses para los BONOS DEL TESORO NACIONAL EN PESOS CON AJUSTE POR CER 2,00% VTO. 2026 (BONCER 2026 2,00%) son el 9 de mayo y el 9 de noviembre de cada año, comenzando el 9 de mayo de 2021. | ||
ISIN | ARARGE3209W8 |