Bonos Globales de la Republica Argentina USD Step Up Vto. 2046
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2021-07-09100.0017282.0018.300.0018.30
2022-01-09100.0021269.00119.640.00119.64
2022-07-09100.0029698.00167.050.00167.05
2023-01-09100.0033816.00253.620.00253.62
2023-07-09100.0049861.00373.960.00373.96
2024-01-09100.00118368.002145.420.002145.42
2024-07-09100.00138150.002503.970.002503.97
2025-01-0997.73115450.152436.532684.855121.39
2025-07-0995.45109910.242320.872616.884937.75
2026-01-0993.18107293.372266.902616.884883.78
2026-07-0990.91104676.492212.932616.884829.80
2027-01-0988.64102059.612158.952616.884775.83
2027-07-0986.3699442.732104.982616.884721.86
2028-01-0984.0996825.862175.312616.884792.19
2028-07-0981.8294208.982118.072616.884734.94
2029-01-0979.5591592.102355.222616.884972.10
2029-07-0977.2788975.222289.802616.884906.68
2030-01-0975.0086358.352224.382616.884841.26
2030-07-0972.7383741.472158.962616.884775.84
2031-01-0970.4581124.592093.542616.884710.41
2031-07-0968.1878507.712028.112616.884644.99
2032-01-0965.9175890.831962.692616.884579.57
2032-07-0963.6473273.961897.272616.884514.15
2033-01-0961.3670657.081831.852616.884448.73
2033-07-0959.0968040.201766.432616.884383.30
2034-01-0956.8265423.321701.012616.884317.88
2034-07-0954.5562806.451635.582616.884252.46
2035-01-0952.2760189.571570.162616.884187.04
2035-07-0950.0057572.691504.742616.884121.62
2036-01-0947.7354955.811439.322616.884056.19
2036-07-0945.4652338.941373.902616.883990.77
2037-01-0943.1849722.061308.472616.883925.35
2037-07-0940.9147105.181243.052616.883859.93
2038-01-0938.6444488.301177.632616.883794.51
2038-07-0936.3641871.421112.212616.883729.09
2039-01-0934.0939254.551046.792616.883663.66
2039-07-0931.8236637.67981.362616.883598.24
2040-01-0929.5534020.79915.942616.883532.82
2040-07-0927.2731403.91850.522616.883467.40
2041-01-0925.0028787.04785.102616.883401.98
2041-07-0922.7326170.16719.682616.883336.55
2042-01-0920.4623553.28654.252616.883271.13
2042-07-0918.1820936.40588.832616.883205.71
2043-01-0915.9118319.53523.412616.883140.29
2043-07-0913.6415702.65457.992616.883074.87
2044-01-0911.3613085.77392.572616.883009.44
2044-07-099.0910468.89327.142616.882944.02
2045-01-096.827852.01261.722616.882878.60
2045-07-094.555235.14196.302616.882813.18
2046-01-092.272618.26130.882616.882747.76
2046-07-090.001.3865.462616.882682.33
Expresar en moneda de pago CCL
Datos
SimboloGD46Valor Tecnico114061.48Semana TIR-3.83%
EmisorArgentinaArgentinaValor Residual97.73%Mes TIR-21.17%
TipoSoberanoParidad67.31%Semestre TIR-11.11%
PaísArgentinaTIR10.80%1ero Enero TIR4.25%
MercadoBYMAMacaulay Dur.6.28Año TIR-32.75%
MonedaARSModified Dur.5.67Semana Precio-1.31%
Fecha/Hora2025-05-08 16:49:03Effective Dur.0.61Mes Precio-1.25%
Volumen120621Convexidad58.65Semestre Precio5.76%
Precio76780.00Int. Corrido1534.351ero Enero Precio-8.05%
Variación-0.03%Cupon4937.75Año Precio42.69%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
84458.0010.00%9.18-14.96%
83690.209.00%9.33-13.57%
82922.408.00%9.49-12.16%
82154.607.00%9.64-10.73%
81386.806.00%9.80-9.28%
80619.005.00%9.96-7.79%
79851.204.00%10.12-6.28%
79083.403.00%10.29-4.75%
78315.602.00%10.46-3.18%
77547.801.00%10.63-1.60%
76780.000.00%10.800.00%
76012.20-1.00%10.981.68%
75244.40-2.00%11.163.35%
74476.60-3.00%11.355.06%
73708.80-4.00%11.536.81%
72941.00-5.00%11.738.59%
72173.20-6.00%11.9210.40%
71405.40-7.00%12.1212.25%
70637.60-8.00%12.3314.14%
69869.80-9.00%12.5316.06%
69102.00-10.00%12.7518.03%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
11.779.00%72763.42-5.23%
11.668.00%73191.38-4.67%
11.567.00%73624.03-4.11%
11.456.00%74061.42-3.54%
11.345.00%74503.63-2.96%
11.234.00%74950.73-2.38%
11.123.00%75402.79-1.79%
11.022.00%75859.88-1.20%
10.911.00%76322.07-0.60%
10.800.00%76780.000.00%
10.69-1.00%77262.060.63%
10.58-2.00%77740.021.25%
10.48-3.00%78223.391.88%
10.37-4.00%78712.242.52%
10.26-5.00%79206.673.16%
10.15-6.00%79706.763.81%
10.04-7.00%80212.584.47%
9.94-8.00%80724.225.14%
9.83-9.00%81241.775.81%
Desarrollo TIR
Desarrollo TIR 10.80%
FechaFormulaOperacionFactorTipo
2025-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.04125 x (180/360)) x 97.73% x 100.00 x 1151.44]/[(1+10.80)^(61/360)]2280.89i
2025-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(61/360)]2571.80k
2026-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.04125 x (180/360)) x 95.45% x 100.00 x 1151.44]/[(1+10.80)^(241/360)]2116.49i
2026-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(241/360)]2443.24k
2026-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.04125 x (180/360)) x 93.18% x 100.00 x 1151.44]/[(1+10.80)^(421/360)]1962.82i
2026-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(421/360)]2321.11k
2027-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.04125 x (180/360)) x 90.91% x 100.00 x 1151.44]/[(1+10.80)^(601/360)]1819.23i
2027-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(601/360)]2205.09k
2027-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.04125 x (180/360)) x 88.64% x 100.00 x 1151.44]/[(1+10.80)^(781/360)]1685.08i
2027-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(781/360)]2094.87k
2028-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.04375 x (180/360)) x 86.36% x 100.00 x 1151.44]/[(1+10.80)^(961/360)]1654.34i
2028-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(961/360)]1990.16k
2028-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.04375 x (180/360)) x 84.09% x 100.00 x 1151.44]/[(1+10.80)^(1141/360)]1530.29i
2028-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1141/360)]1890.68k
2029-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 81.82% x 100.00 x 1151.44]/[(1+10.80)^(1321/360)]1616.58i
2029-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1321/360)]1796.17k
2029-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 79.55% x 100.00 x 1151.44]/[(1+10.80)^(1501/360)]1493.11i
2029-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1501/360)]1706.39k
2030-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 77.27% x 100.00 x 1151.44]/[(1+10.80)^(1681/360)]1377.95i
2030-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1681/360)]1621.09k
2030-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 75.00% x 100.00 x 1151.44]/[(1+10.80)^(1861/360)]1270.57i
2030-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1861/360)]1540.06k
2031-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 72.73% x 100.00 x 1151.44]/[(1+10.80)^(2041/360)]1170.48i
2031-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2041/360)]1463.08k
2031-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 70.45% x 100.00 x 1151.44]/[(1+10.80)^(2221/360)]1077.23i
2031-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2221/360)]1389.95k
2032-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 68.18% x 100.00 x 1151.44]/[(1+10.80)^(2401/360)]990.37i
2032-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2401/360)]1320.47k
2032-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 65.91% x 100.00 x 1151.44]/[(1+10.80)^(2581/360)]909.50i
2032-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2581/360)]1254.46k
2033-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 63.64% x 100.00 x 1151.44]/[(1+10.80)^(2761/360)]834.25i
2033-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2761/360)]1191.76k
2033-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 61.36% x 100.00 x 1151.44]/[(1+10.80)^(2941/360)]764.24i
2033-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2941/360)]1132.19k
2034-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 59.09% x 100.00 x 1151.44]/[(1+10.80)^(3121/360)]699.15i
2034-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3121/360)]1075.59k
2034-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 56.82% x 100.00 x 1151.44]/[(1+10.80)^(3301/360)]638.66i
2034-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3301/360)]1021.83k
2035-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 54.55% x 100.00 x 1151.44]/[(1+10.80)^(3481/360)]582.46i
2035-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3481/360)]970.75k
2035-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 52.27% x 100.00 x 1151.44]/[(1+10.80)^(3661/360)]530.29i
2035-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3661/360)]922.23k
2036-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 50.00% x 100.00 x 1151.44]/[(1+10.80)^(3841/360)]481.88i
2036-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3841/360)]876.13k
2036-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 47.73% x 100.00 x 1151.44]/[(1+10.80)^(4021/360)]436.99i
2036-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4021/360)]832.34k
2037-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 45.46% x 100.00 x 1151.44]/[(1+10.80)^(4201/360)]395.38i
2037-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4201/360)]790.73k
2037-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 43.18% x 100.00 x 1151.44]/[(1+10.80)^(4381/360)]356.83i
2037-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4381/360)]751.21k
2038-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 40.91% x 100.00 x 1151.44]/[(1+10.80)^(4561/360)]321.15i
2038-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4561/360)]713.66k
2038-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 38.64% x 100.00 x 1151.44]/[(1+10.80)^(4741/360)]288.15i
2038-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4741/360)]677.98k
2039-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 36.36% x 100.00 x 1151.44]/[(1+10.80)^(4921/360)]257.65i
2039-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4921/360)]644.09k
2039-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 34.09% x 100.00 x 1151.44]/[(1+10.80)^(5101/360)]229.47i
2039-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5101/360)]611.90k
2040-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 31.82% x 100.00 x 1151.44]/[(1+10.80)^(5281/360)]203.47i
2040-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5281/360)]581.31k
2040-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 29.55% x 100.00 x 1151.44]/[(1+10.80)^(5461/360)]179.49i
2040-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5461/360)]552.26k
2041-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 27.27% x 100.00 x 1151.44]/[(1+10.80)^(5641/360)]157.40i
2041-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5641/360)]524.65k
2041-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 25.00% x 100.00 x 1151.44]/[(1+10.80)^(5821/360)]137.07i
2041-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5821/360)]498.43k
2042-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 22.73% x 100.00 x 1151.44]/[(1+10.80)^(6001/360)]118.38i
2042-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6001/360)]473.51k
2042-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 20.46% x 100.00 x 1151.44]/[(1+10.80)^(6181/360)]101.22i
2042-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6181/360)]449.84k
2043-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 18.18% x 100.00 x 1151.44]/[(1+10.80)^(6361/360)]85.48i
2043-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6361/360)]427.36k
2043-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 15.91% x 100.00 x 1151.44]/[(1+10.80)^(6541/360)]71.05i
2043-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6541/360)]406.00k
2044-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 13.64% x 100.00 x 1151.44]/[(1+10.80)^(6721/360)]57.86i
2044-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6721/360)]385.70k
2044-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 11.36% x 100.00 x 1151.44]/[(1+10.80)^(6901/360)]45.81i
2044-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6901/360)]366.42k
2045-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 9.09% x 100.00 x 1151.44]/[(1+10.80)^(7081/360)]34.82i
2045-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7081/360)]348.11k
2045-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 6.82% x 100.00 x 1151.44]/[(1+10.80)^(7261/360)]24.81i
2045-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7261/360)]330.71k
2046-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 4.55% x 100.00 x 1151.44]/[(1+10.80)^(7441/360)]15.71i
2046-01-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7441/360)]314.17k
2046-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.05 x (180/360)) x 2.27% x 100.00 x 1151.44]/[(1+10.80)^(7621/360)]7.47i
2046-07-09[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7621/360)]298.47k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-08(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL x (Dias Corridos / Dias entre Cupones)(0.04125 x (180/360)) x 1.00 x 0.977273 x 100.00 x 1151.44 x (119/180)1534.35
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-07-09(Dias para cupon / Dias Año)(61 / 360)0.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(61/360)]+[(0.04125 x (180/360)) x 97.73% x 100.00 x 1151.44]/[(1+10.80)^(61/360)]4852.660.060.01ki
2026-01-09(Dias para cupon / Dias Año)(241 / 360)0.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(241/360)]+[(0.04125 x (180/360)) x 95.45% x 100.00 x 1151.44]/[(1+10.80)^(241/360)]4559.640.060.04ki
2026-07-09(Dias para cupon / Dias Año)(421 / 360)1.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(421/360)]+[(0.04125 x (180/360)) x 93.18% x 100.00 x 1151.44]/[(1+10.80)^(421/360)]4283.800.060.07ki
2027-01-09(Dias para cupon / Dias Año)(601 / 360)1.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(601/360)]+[(0.04125 x (180/360)) x 90.91% x 100.00 x 1151.44]/[(1+10.80)^(601/360)]4024.140.050.09ki
2027-07-09(Dias para cupon / Dias Año)(781 / 360)2.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(781/360)]+[(0.04125 x (180/360)) x 88.64% x 100.00 x 1151.44]/[(1+10.80)^(781/360)]3779.730.050.11ki
2028-01-09(Dias para cupon / Dias Año)(961 / 360)2.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(961/360)]+[(0.04375 x (180/360)) x 86.36% x 100.00 x 1151.44]/[(1+10.80)^(961/360)]3644.230.050.13ki
2028-07-09(Dias para cupon / Dias Año)(1141 / 360)3.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1141/360)]+[(0.04375 x (180/360)) x 84.09% x 100.00 x 1151.44]/[(1+10.80)^(1141/360)]3420.670.040.14ki
2029-01-09(Dias para cupon / Dias Año)(1321 / 360)3.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1321/360)]+[(0.05 x (180/360)) x 81.82% x 100.00 x 1151.44]/[(1+10.80)^(1321/360)]3412.410.040.16ki
2029-07-09(Dias para cupon / Dias Año)(1501 / 360)4.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1501/360)]+[(0.05 x (180/360)) x 79.55% x 100.00 x 1151.44]/[(1+10.80)^(1501/360)]3199.140.040.17ki
2030-01-09(Dias para cupon / Dias Año)(1681 / 360)4.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1681/360)]+[(0.05 x (180/360)) x 77.27% x 100.00 x 1151.44]/[(1+10.80)^(1681/360)]2998.660.040.18ki
2030-07-09(Dias para cupon / Dias Año)(1861 / 360)5.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1861/360)]+[(0.05 x (180/360)) x 75.00% x 100.00 x 1151.44]/[(1+10.80)^(1861/360)]2810.240.040.19ki
2031-01-09(Dias para cupon / Dias Año)(2041 / 360)5.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2041/360)]+[(0.05 x (180/360)) x 72.73% x 100.00 x 1151.44]/[(1+10.80)^(2041/360)]2633.160.030.19ki
2031-07-09(Dias para cupon / Dias Año)(2221 / 360)6.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2221/360)]+[(0.05 x (180/360)) x 70.45% x 100.00 x 1151.44]/[(1+10.80)^(2221/360)]2466.760.030.20ki
2032-01-09(Dias para cupon / Dias Año)(2401 / 360)6.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2401/360)]+[(0.05 x (180/360)) x 68.18% x 100.00 x 1151.44]/[(1+10.80)^(2401/360)]2310.420.030.20ki
2032-07-09(Dias para cupon / Dias Año)(2581 / 360)7.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2581/360)]+[(0.05 x (180/360)) x 65.91% x 100.00 x 1151.44]/[(1+10.80)^(2581/360)]2163.550.030.20ki
2033-01-09(Dias para cupon / Dias Año)(2761 / 360)7.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2761/360)]+[(0.05 x (180/360)) x 63.64% x 100.00 x 1151.44]/[(1+10.80)^(2761/360)]2025.580.030.20ki
2033-07-09(Dias para cupon / Dias Año)(2941 / 360)8.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2941/360)]+[(0.05 x (180/360)) x 61.36% x 100.00 x 1151.44]/[(1+10.80)^(2941/360)]1896.010.020.20ki
2034-01-09(Dias para cupon / Dias Año)(3121 / 360)8.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3121/360)]+[(0.05 x (180/360)) x 59.09% x 100.00 x 1151.44]/[(1+10.80)^(3121/360)]1774.330.020.20ki
2034-07-09(Dias para cupon / Dias Año)(3301 / 360)9.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3301/360)]+[(0.05 x (180/360)) x 56.82% x 100.00 x 1151.44]/[(1+10.80)^(3301/360)]1660.070.020.20ki
2035-01-09(Dias para cupon / Dias Año)(3481 / 360)9.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3481/360)]+[(0.05 x (180/360)) x 54.55% x 100.00 x 1151.44]/[(1+10.80)^(3481/360)]1552.810.020.20ki
2035-07-09(Dias para cupon / Dias Año)(3661 / 360)10.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3661/360)]+[(0.05 x (180/360)) x 52.27% x 100.00 x 1151.44]/[(1+10.80)^(3661/360)]1452.120.020.19ki
2036-01-09(Dias para cupon / Dias Año)(3841 / 360)10.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3841/360)]+[(0.05 x (180/360)) x 50.00% x 100.00 x 1151.44]/[(1+10.80)^(3841/360)]1357.620.020.19ki
2036-07-09(Dias para cupon / Dias Año)(4021 / 360)11.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4021/360)]+[(0.05 x (180/360)) x 47.73% x 100.00 x 1151.44]/[(1+10.80)^(4021/360)]1268.940.020.18ki
2037-01-09(Dias para cupon / Dias Año)(4201 / 360)11.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4201/360)]+[(0.05 x (180/360)) x 45.46% x 100.00 x 1151.44]/[(1+10.80)^(4201/360)]1185.730.020.18ki
2037-07-09(Dias para cupon / Dias Año)(4381 / 360)12.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4381/360)]+[(0.05 x (180/360)) x 43.18% x 100.00 x 1151.44]/[(1+10.80)^(4381/360)]1107.670.010.18ki
2038-01-09(Dias para cupon / Dias Año)(4561 / 360)12.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4561/360)]+[(0.05 x (180/360)) x 40.91% x 100.00 x 1151.44]/[(1+10.80)^(4561/360)]1034.460.010.17ki
2038-07-09(Dias para cupon / Dias Año)(4741 / 360)13.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4741/360)]+[(0.05 x (180/360)) x 38.64% x 100.00 x 1151.44]/[(1+10.80)^(4741/360)]965.790.010.17ki
2039-01-09(Dias para cupon / Dias Año)(4921 / 360)13.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4921/360)]+[(0.05 x (180/360)) x 36.36% x 100.00 x 1151.44]/[(1+10.80)^(4921/360)]901.410.010.16ki
2039-07-09(Dias para cupon / Dias Año)(5101 / 360)14.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5101/360)]+[(0.05 x (180/360)) x 34.09% x 100.00 x 1151.44]/[(1+10.80)^(5101/360)]841.050.010.16ki
2040-01-09(Dias para cupon / Dias Año)(5281 / 360)14.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5281/360)]+[(0.05 x (180/360)) x 31.82% x 100.00 x 1151.44]/[(1+10.80)^(5281/360)]784.470.010.15ki
2040-07-09(Dias para cupon / Dias Año)(5461 / 360)15.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5461/360)]+[(0.05 x (180/360)) x 29.55% x 100.00 x 1151.44]/[(1+10.80)^(5461/360)]731.450.010.14ki
2041-01-09(Dias para cupon / Dias Año)(5641 / 360)15.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5641/360)]+[(0.05 x (180/360)) x 27.27% x 100.00 x 1151.44]/[(1+10.80)^(5641/360)]681.760.010.14ki
2041-07-09(Dias para cupon / Dias Año)(5821 / 360)16.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5821/360)]+[(0.05 x (180/360)) x 25.00% x 100.00 x 1151.44]/[(1+10.80)^(5821/360)]635.220.010.13ki
2042-01-09(Dias para cupon / Dias Año)(6001 / 360)16.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6001/360)]+[(0.05 x (180/360)) x 22.73% x 100.00 x 1151.44]/[(1+10.80)^(6001/360)]591.630.010.13ki
2042-07-09(Dias para cupon / Dias Año)(6181 / 360)17.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6181/360)]+[(0.05 x (180/360)) x 20.46% x 100.00 x 1151.44]/[(1+10.80)^(6181/360)]550.810.010.12ki
2043-01-09(Dias para cupon / Dias Año)(6361 / 360)17.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6361/360)]+[(0.05 x (180/360)) x 18.18% x 100.00 x 1151.44]/[(1+10.80)^(6361/360)]512.590.010.12ki
2043-07-09(Dias para cupon / Dias Año)(6541 / 360)18.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6541/360)]+[(0.05 x (180/360)) x 15.91% x 100.00 x 1151.44]/[(1+10.80)^(6541/360)]476.810.010.11ki
2044-01-09(Dias para cupon / Dias Año)(6721 / 360)18.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6721/360)]+[(0.05 x (180/360)) x 13.64% x 100.00 x 1151.44]/[(1+10.80)^(6721/360)]443.340.010.11ki
2044-07-09(Dias para cupon / Dias Año)(6901 / 360)19.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6901/360)]+[(0.05 x (180/360)) x 11.36% x 100.00 x 1151.44]/[(1+10.80)^(6901/360)]412.020.010.10ki
2045-01-09(Dias para cupon / Dias Año)(7081 / 360)19.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7081/360)]+[(0.05 x (180/360)) x 9.09% x 100.00 x 1151.44]/[(1+10.80)^(7081/360)]382.720.000.10ki
2045-07-09(Dias para cupon / Dias Año)(7261 / 360)20.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7261/360)]+[(0.05 x (180/360)) x 6.82% x 100.00 x 1151.44]/[(1+10.80)^(7261/360)]355.320.000.09ki
2046-01-09(Dias para cupon / Dias Año)(7441 / 360)20.67[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7441/360)]+[(0.05 x (180/360)) x 4.55% x 100.00 x 1151.44]/[(1+10.80)^(7441/360)]329.700.000.09ki
2046-07-09(Dias para cupon / Dias Año)(7621 / 360)21.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7621/360)]+[(0.05 x (180/360)) x 2.27% x 100.00 x 1151.44]/[(1+10.80)^(7621/360)]305.760.000.08ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores6.286.28
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(6.28)/(1 + 10.80/100)5.67
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(76309.03 - 77249.00 )/( 2 x 76780 x 0.01)0.61
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](61 / 360) ^ 2 + (61 / 360)0.20[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(61/360)]+[(0.04125 x (180/360)) x 97.73% x 100.00 x 1151.44]/[(1+10.80)^(61/360)]4852.66961.58ki
2026-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](241 / 360) ^ 2 + (241 / 360)1.12[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(241/360)]+[(0.04125 x (180/360)) x 95.45% x 100.00 x 1151.44]/[(1+10.80)^(241/360)]4559.645095.86ki
2026-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](421 / 360) ^ 2 + (421 / 360)2.54[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(421/360)]+[(0.04125 x (180/360)) x 93.18% x 100.00 x 1151.44]/[(1+10.80)^(421/360)]4283.8010868.19ki
2027-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](601 / 360) ^ 2 + (601 / 360)4.46[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(601/360)]+[(0.04125 x (180/360)) x 90.91% x 100.00 x 1151.44]/[(1+10.80)^(601/360)]4024.1417933.52ki
2027-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](781 / 360) ^ 2 + (781 / 360)6.88[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(781/360)]+[(0.04125 x (180/360)) x 88.64% x 100.00 x 1151.44]/[(1+10.80)^(781/360)]3779.7325989.17ki
2028-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](961 / 360) ^ 2 + (961 / 360)9.80[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(961/360)]+[(0.04375 x (180/360)) x 86.36% x 100.00 x 1151.44]/[(1+10.80)^(961/360)]3644.2335696.63ki
2028-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1141 / 360) ^ 2 + (1141 / 360)13.21[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1141/360)]+[(0.04375 x (180/360)) x 84.09% x 100.00 x 1151.44]/[(1+10.80)^(1141/360)]3420.6745203.55ki
2029-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1321 / 360) ^ 2 + (1321 / 360)17.13[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1321/360)]+[(0.05 x (180/360)) x 81.82% x 100.00 x 1151.44]/[(1+10.80)^(1321/360)]3412.4158469.08ki
2029-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1501 / 360) ^ 2 + (1501 / 360)21.55[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1501/360)]+[(0.05 x (180/360)) x 79.55% x 100.00 x 1151.44]/[(1+10.80)^(1501/360)]3199.1468953.25ki
2030-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1681 / 360) ^ 2 + (1681 / 360)26.47[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1681/360)]+[(0.05 x (180/360)) x 77.27% x 100.00 x 1151.44]/[(1+10.80)^(1681/360)]2998.6679384.03ki
2030-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1861 / 360) ^ 2 + (1861 / 360)31.89[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(1861/360)]+[(0.05 x (180/360)) x 75.00% x 100.00 x 1151.44]/[(1+10.80)^(1861/360)]2810.2489625.74ki
2031-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2041 / 360) ^ 2 + (2041 / 360)37.81[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2041/360)]+[(0.05 x (180/360)) x 72.73% x 100.00 x 1151.44]/[(1+10.80)^(2041/360)]2633.1699565.05ki
2031-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2221 / 360) ^ 2 + (2221 / 360)44.23[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2221/360)]+[(0.05 x (180/360)) x 70.45% x 100.00 x 1151.44]/[(1+10.80)^(2221/360)]2466.76109108.47ki
2032-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2401 / 360) ^ 2 + (2401 / 360)51.15[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2401/360)]+[(0.05 x (180/360)) x 68.18% x 100.00 x 1151.44]/[(1+10.80)^(2401/360)]2310.42118180.12ki
2032-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2581 / 360) ^ 2 + (2581 / 360)58.57[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2581/360)]+[(0.05 x (180/360)) x 65.91% x 100.00 x 1151.44]/[(1+10.80)^(2581/360)]2163.55126719.73ki
2033-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2761 / 360) ^ 2 + (2761 / 360)66.49[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2761/360)]+[(0.05 x (180/360)) x 63.64% x 100.00 x 1151.44]/[(1+10.80)^(2761/360)]2025.58134680.74ki
2033-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2941 / 360) ^ 2 + (2941 / 360)74.91[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(2941/360)]+[(0.05 x (180/360)) x 61.36% x 100.00 x 1151.44]/[(1+10.80)^(2941/360)]1896.01142028.68ki
2034-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3121 / 360) ^ 2 + (3121 / 360)83.83[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3121/360)]+[(0.05 x (180/360)) x 59.09% x 100.00 x 1151.44]/[(1+10.80)^(3121/360)]1774.33148739.64ki
2034-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3301 / 360) ^ 2 + (3301 / 360)93.25[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3301/360)]+[(0.05 x (180/360)) x 56.82% x 100.00 x 1151.44]/[(1+10.80)^(3301/360)]1660.07154798.91ki
2035-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3481 / 360) ^ 2 + (3481 / 360)103.17[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3481/360)]+[(0.05 x (180/360)) x 54.55% x 100.00 x 1151.44]/[(1+10.80)^(3481/360)]1552.81160199.77ki
2035-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3661 / 360) ^ 2 + (3661 / 360)113.59[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3661/360)]+[(0.05 x (180/360)) x 52.27% x 100.00 x 1151.44]/[(1+10.80)^(3661/360)]1452.12164942.37ki
2036-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3841 / 360) ^ 2 + (3841 / 360)124.51[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(3841/360)]+[(0.05 x (180/360)) x 50.00% x 100.00 x 1151.44]/[(1+10.80)^(3841/360)]1357.62169032.75ki
2036-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4021 / 360) ^ 2 + (4021 / 360)135.93[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4021/360)]+[(0.05 x (180/360)) x 47.73% x 100.00 x 1151.44]/[(1+10.80)^(4021/360)]1268.94172481.94ki
2037-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4201 / 360) ^ 2 + (4201 / 360)147.85[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4201/360)]+[(0.05 x (180/360)) x 45.46% x 100.00 x 1151.44]/[(1+10.80)^(4201/360)]1185.73175305.19ki
2037-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4381 / 360) ^ 2 + (4381 / 360)160.26[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4381/360)]+[(0.05 x (180/360)) x 43.18% x 100.00 x 1151.44]/[(1+10.80)^(4381/360)]1107.67177521.23ki
2038-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4561 / 360) ^ 2 + (4561 / 360)173.18[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4561/360)]+[(0.05 x (180/360)) x 40.91% x 100.00 x 1151.44]/[(1+10.80)^(4561/360)]1034.46179151.65ki
2038-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4741 / 360) ^ 2 + (4741 / 360)186.60[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4741/360)]+[(0.05 x (180/360)) x 38.64% x 100.00 x 1151.44]/[(1+10.80)^(4741/360)]965.79180220.35ki
2039-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4921 / 360) ^ 2 + (4921 / 360)200.52[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(4921/360)]+[(0.05 x (180/360)) x 36.36% x 100.00 x 1151.44]/[(1+10.80)^(4921/360)]901.41180753.02ki
2039-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5101 / 360) ^ 2 + (5101 / 360)214.94[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5101/360)]+[(0.05 x (180/360)) x 34.09% x 100.00 x 1151.44]/[(1+10.80)^(5101/360)]841.05180776.73ki
2040-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5281 / 360) ^ 2 + (5281 / 360)229.86[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5281/360)]+[(0.05 x (180/360)) x 31.82% x 100.00 x 1151.44]/[(1+10.80)^(5281/360)]784.47180319.49ki
2040-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5461 / 360) ^ 2 + (5461 / 360)245.28[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5461/360)]+[(0.05 x (180/360)) x 29.55% x 100.00 x 1151.44]/[(1+10.80)^(5461/360)]731.45179409.98ki
2041-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5641 / 360) ^ 2 + (5641 / 360)261.20[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5641/360)]+[(0.05 x (180/360)) x 27.27% x 100.00 x 1151.44]/[(1+10.80)^(5641/360)]681.76178077.22ki
2041-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5821 / 360) ^ 2 + (5821 / 360)277.62[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(5821/360)]+[(0.05 x (180/360)) x 25.00% x 100.00 x 1151.44]/[(1+10.80)^(5821/360)]635.22176350.27ki
2042-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](6001 / 360) ^ 2 + (6001 / 360)294.54[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6001/360)]+[(0.05 x (180/360)) x 22.73% x 100.00 x 1151.44]/[(1+10.80)^(6001/360)]591.63174258.10ki
2042-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](6181 / 360) ^ 2 + (6181 / 360)311.96[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6181/360)]+[(0.05 x (180/360)) x 20.46% x 100.00 x 1151.44]/[(1+10.80)^(6181/360)]550.81171829.31ki
2043-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](6361 / 360) ^ 2 + (6361 / 360)329.88[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6361/360)]+[(0.05 x (180/360)) x 18.18% x 100.00 x 1151.44]/[(1+10.80)^(6361/360)]512.59169092.03ki
2043-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](6541 / 360) ^ 2 + (6541 / 360)348.30[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6541/360)]+[(0.05 x (180/360)) x 15.91% x 100.00 x 1151.44]/[(1+10.80)^(6541/360)]476.81166073.75ki
2044-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](6721 / 360) ^ 2 + (6721 / 360)367.22[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6721/360)]+[(0.05 x (180/360)) x 13.64% x 100.00 x 1151.44]/[(1+10.80)^(6721/360)]443.34162801.21ki
2044-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](6901 / 360) ^ 2 + (6901 / 360)386.64[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(6901/360)]+[(0.05 x (180/360)) x 11.36% x 100.00 x 1151.44]/[(1+10.80)^(6901/360)]412.02159300.32ki
2045-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](7081 / 360) ^ 2 + (7081 / 360)406.56[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7081/360)]+[(0.05 x (180/360)) x 9.09% x 100.00 x 1151.44]/[(1+10.80)^(7081/360)]382.72155596.06ki
2045-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](7261 / 360) ^ 2 + (7261 / 360)426.98[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7261/360)]+[(0.05 x (180/360)) x 6.82% x 100.00 x 1151.44]/[(1+10.80)^(7261/360)]355.32151712.45ki
2046-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](7441 / 360) ^ 2 + (7441 / 360)447.90[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7441/360)]+[(0.05 x (180/360)) x 4.55% x 100.00 x 1151.44]/[(1+10.80)^(7441/360)]329.70147672.50ki
2046-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](7621 / 360) ^ 2 + (7621 / 360)469.31[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.022727 x 100.00 x 1151.44]/[(1+10.80)^(7621/360)]+[(0.05 x (180/360)) x 2.27% x 100.00 x 1151.44]/[(1+10.80)^(7621/360)]305.76143498.13ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [76780 x ((1 + 10.803) ^ 2)]] x 5528377.74]58.65
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2020-09-04
F. de Vencimiento2046-07-09
Ajuste
Dias previos para calculo ajuste o interes
CapitalLa amortizacion se efectuara en CUARENTA Y CUATRO (44) cuotas semestrales iguales el 9 de enero y 9 de julio de cada año, con la primera cuota el 9 de enero de 2025 y la ultima cuota el 9 de julio de 2046.
InteresLos Titulos Amortizables Step Up en USD 2046 devengaran intereses semestrales, sobre la base de un año de TRESCIENTOS SESENTA (360) dias integrado por DOCE (12) meses de TREINTA (30) dias cada uno, de acuerdo con las siguientes tasas anuales: i. Del 4 de septiembre de 2020 (exclusive) al 9 de julio de 2021 (exclusive): CERO COMA CIENTO VEINTICINCO POR CIENTO (0,125%). ii. Del 9 de julio de 2021 (inclusive) al 9 de julio de 2022 (exclusive): UNO COMA CIENTO VEINTICINCO POR CIENTO (1,125%). iii. Del 9 de julio de 2022 (inclusive) al 9 de julio de 2023 (exclusive): UNO COMA CINCUENTA POR CIENTO (1,50%). iv. Del 9 de julio de 2023 (inclusive) al 9 de julio de 2024 (exclusive): TRES COMA SEISCIENTOS VEINTICINCO POR CIENTO (3,625%). v. Del 9 de julio de 2024 (inclusive) al 9 de julio de 2027 (exclusive): CUATRO COMA CIENTO VEINTICINCO POR CIENTO (4,125%). vi. Del 9 de julio de 2027 (inclusive) al 9 de julio de 2028 (exclusive): CUATRO COMA TRESCIENTOS SETENTA Y CINCO POR CIENTO (4,375%). vii. Del 9 de julio de 2028 (inclusive) al 9 de julio de 2046 (exclusive): CINCO POR CIENTO (5,00%).
FrecuenciaLas fechas de pago de intereses para los Titulos Amortizables Step Up en USD 2046 son el 9 de enero y el 9 de julio de cada año, comenzando el 9 de julio del 2021
ISINUS040114HW38
¿Ves algun dato que parece incorrecto?