Bonos Globales de la Republica Argentina USD Step Up Vto. 2041
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2021-07-09100.00103.490.110.000.11
2022-01-09100.00105.581.320.001.32
2022-07-09100.00105.591.320.001.32
2023-01-09100.00103.711.810.001.81
2023-07-09100.00102.411.790.001.79
2024-01-09100.00102.661.800.001.80
2024-07-09100.0099.441.740.001.74
2025-01-09100.00101.971.780.001.78
2025-07-09100.00100.691.760.001.76
2026-01-09100.00100.691.760.001.76
2026-07-09100.00100.691.760.001.76
2027-01-09100.00100.691.760.001.76
2027-07-09100.00100.691.760.001.76
2028-01-0996.4397.101.763.595.36
2028-07-0992.8693.501.703.595.29
2029-01-0989.2989.911.643.595.23
2029-07-0985.7186.301.573.595.17
2030-01-0982.1482.712.113.595.70
2030-07-0978.5779.112.023.595.61
2031-01-0975.0075.521.933.595.52
2031-07-0971.4371.921.843.595.44
2032-01-0967.8668.331.753.595.35
2032-07-0964.2964.731.673.595.26
2033-01-0960.7161.131.583.595.17
2033-07-0957.1457.531.493.595.09
2034-01-0953.5753.941.403.595.00
2034-07-0950.0050.341.323.594.91
2035-01-0946.4346.751.233.594.82
2035-07-0942.8643.161.143.594.74
2036-01-0939.2939.561.053.594.65
2036-07-0935.7135.960.973.594.56
2037-01-0932.1432.360.883.594.47
2037-07-0928.5728.770.793.594.38
2038-01-0925.0025.170.703.594.30
2038-07-0921.4321.580.613.594.21
2039-01-0917.8617.980.533.594.12
2039-07-0914.2914.390.443.594.03
2040-01-0910.7210.790.353.593.95
2040-07-097.147.190.263.593.86
2041-01-093.573.590.183.593.77
2041-07-090.000.000.093.593.68
Expresar en moneda de pago CCL
Datos
SimboloGD41DValor Tecnico101.85Semana TIR-0.99%
EmisorArgentinaArgentinaValor Residual100.00%Mes TIR-21.76%
TipoSoberanoParidad63.57%Semestre TIR-11.89%
PaísArgentinaTIR11.04%1ero Enero TIR2.60%
MercadoBYMAMacaulay Dur.6.64Año TIR-32.60%
MonedaUSDModified Dur.5.98Semana Precio0.15%
Fecha/Hora2025-05-08 16:49:46Effective Dur.0.66Mes Precio21.41%
Volumen1296723Convexidad54.11Semestre Precio10.49%
Precio64.75Int. Corrido1.161ero Enero Precio-1.60%
Variación0.56%Cupon1.76Año Precio40.15%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
71.2210.00%9.49-14.08%
70.589.00%9.63-12.75%
69.938.00%9.78-11.41%
69.287.00%9.93-10.06%
68.646.00%10.08-8.68%
67.995.00%10.24-7.28%
67.344.00%10.39-5.86%
66.693.00%10.55-4.42%
66.052.00%10.71-2.96%
65.401.00%10.88-1.48%
64.750.00%11.040.00%
64.10-1.00%11.211.55%
63.45-2.00%11.383.10%
62.81-3.00%11.564.67%
62.16-4.00%11.736.28%
61.51-5.00%11.917.90%
60.87-6.00%12.099.56%
60.22-7.00%12.2811.23%
59.57-8.00%12.4712.93%
58.92-9.00%12.6614.67%
58.27-10.00%12.8516.44%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
12.039.00%61.08-5.67%
11.928.00%61.47-5.06%
11.817.00%61.87-4.45%
11.706.00%62.27-3.83%
11.595.00%62.67-3.21%
11.484.00%63.08-2.58%
11.373.00%63.50-1.94%
11.262.00%63.91-1.29%
11.151.00%64.33-0.64%
11.040.00%64.750.00%
10.93-1.00%65.190.68%
10.82-2.00%65.621.35%
10.71-3.00%66.062.02%
10.60-4.00%66.502.71%
10.49-5.00%66.953.40%
10.38-6.00%67.404.10%
10.27-7.00%67.864.80%
10.16-8.00%68.325.51%
10.05-9.00%68.786.23%
Desarrollo TIR
Desarrollo TIR 11.04%
FechaFormulaOperacionFactorTipo
2025-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(61/360)]1.73i
2026-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(241/360)]1.64i
2026-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(421/360)]1.56i
2027-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(601/360)]1.48i
2027-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(781/360)]1.40i
2028-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(961/360)]1.33i
2028-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(961/360)]2.72k
2028-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 96.43% x 100.00 x 1.01]/[(1+11.04)^(1141/360)]1.22i
2028-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1141/360)]2.58k
2029-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 92.86% x 100.00 x 1.01]/[(1+11.04)^(1321/360)]1.11i
2029-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1321/360)]2.45k
2029-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 89.29% x 100.00 x 1.01]/[(1+11.04)^(1501/360)]1.02i
2029-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1501/360)]2.32k
2030-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 85.71% x 100.00 x 1.01]/[(1+11.04)^(1681/360)]1.29i
2030-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1681/360)]2.20k
2030-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 82.14% x 100.00 x 1.01]/[(1+11.04)^(1861/360)]1.17i
2030-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1861/360)]2.09k
2031-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 78.57% x 100.00 x 1.01]/[(1+11.04)^(2041/360)]1.07i
2031-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2041/360)]1.99k
2031-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 75.00% x 100.00 x 1.01]/[(1+11.04)^(2221/360)]0.97i
2031-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2221/360)]1.88k
2032-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 71.43% x 100.00 x 1.01]/[(1+11.04)^(2401/360)]0.87i
2032-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2401/360)]1.79k
2032-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 67.86% x 100.00 x 1.01]/[(1+11.04)^(2581/360)]0.79i
2032-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2581/360)]1.70k
2033-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 64.29% x 100.00 x 1.01]/[(1+11.04)^(2761/360)]0.71i
2033-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2761/360)]1.61k
2033-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 60.71% x 100.00 x 1.01]/[(1+11.04)^(2941/360)]0.63i
2033-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2941/360)]1.53k
2034-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 57.14% x 100.00 x 1.01]/[(1+11.04)^(3121/360)]0.57i
2034-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3121/360)]1.45k
2034-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 53.57% x 100.00 x 1.01]/[(1+11.04)^(3301/360)]0.50i
2034-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3301/360)]1.38k
2035-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 50.00% x 100.00 x 1.01]/[(1+11.04)^(3481/360)]0.45i
2035-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3481/360)]1.31k
2035-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 46.43% x 100.00 x 1.01]/[(1+11.04)^(3661/360)]0.39i
2035-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3661/360)]1.24k
2036-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 42.86% x 100.00 x 1.01]/[(1+11.04)^(3841/360)]0.34i
2036-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3841/360)]1.18k
2036-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 39.29% x 100.00 x 1.01]/[(1+11.04)^(4021/360)]0.30i
2036-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4021/360)]1.12k
2037-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 35.71% x 100.00 x 1.01]/[(1+11.04)^(4201/360)]0.26i
2037-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4201/360)]1.06k
2037-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 32.14% x 100.00 x 1.01]/[(1+11.04)^(4381/360)]0.22i
2037-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4381/360)]1.01k
2038-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 28.57% x 100.00 x 1.01]/[(1+11.04)^(4561/360)]0.19i
2038-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4561/360)]0.95k
2038-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 25.00% x 100.00 x 1.01]/[(1+11.04)^(4741/360)]0.15i
2038-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4741/360)]0.91k
2039-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 21.43% x 100.00 x 1.01]/[(1+11.04)^(4921/360)]0.13i
2039-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4921/360)]0.86k
2039-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 17.86% x 100.00 x 1.01]/[(1+11.04)^(5101/360)]0.10i
2039-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5101/360)]0.82k
2040-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 14.29% x 100.00 x 1.01]/[(1+11.04)^(5281/360)]0.08i
2040-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5281/360)]0.77k
2040-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 10.72% x 100.00 x 1.01]/[(1+11.04)^(5461/360)]0.05i
2040-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5461/360)]0.73k
2041-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 7.14% x 100.00 x 1.01]/[(1+11.04)^(5641/360)]0.03i
2041-01-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5641/360)]0.70k
2041-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.0488 x (180/360)) x 3.57% x 100.00 x 1.01]/[(1+11.04)^(5821/360)]0.02i
2041-07-09[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5821/360)]0.66k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-08(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL x (Dias Corridos / Dias entre Cupones)(0.035 x (180/360)) x 1.00 x 1 x 100.00 x 1.01 x (119/180)1.16
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-07-09(Dias para cupon / Dias Año)(61 / 360)0.17[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(61/360)]1.730.030.00i
2026-01-09(Dias para cupon / Dias Año)(241 / 360)0.67[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(241/360)]1.640.030.02i
2026-07-09(Dias para cupon / Dias Año)(421 / 360)1.17[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(421/360)]1.560.020.03i
2027-01-09(Dias para cupon / Dias Año)(601 / 360)1.67[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(601/360)]1.480.020.04i
2027-07-09(Dias para cupon / Dias Año)(781 / 360)2.17[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(781/360)]1.400.020.05i
2028-01-09(Dias para cupon / Dias Año)(961 / 360)2.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(961/360)]+[(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(961/360)]4.050.060.17ki
2028-07-09(Dias para cupon / Dias Año)(1141 / 360)3.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1141/360)]+[(0.035 x (180/360)) x 96.43% x 100.00 x 1.01]/[(1+11.04)^(1141/360)]3.800.060.19ki
2029-01-09(Dias para cupon / Dias Año)(1321 / 360)3.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1321/360)]+[(0.035 x (180/360)) x 92.86% x 100.00 x 1.01]/[(1+11.04)^(1321/360)]3.560.060.20ki
2029-07-09(Dias para cupon / Dias Año)(1501 / 360)4.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1501/360)]+[(0.035 x (180/360)) x 89.29% x 100.00 x 1.01]/[(1+11.04)^(1501/360)]3.340.050.22ki
2030-01-09(Dias para cupon / Dias Año)(1681 / 360)4.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1681/360)]+[(0.0488 x (180/360)) x 85.71% x 100.00 x 1.01]/[(1+11.04)^(1681/360)]3.500.050.25ki
2030-07-09(Dias para cupon / Dias Año)(1861 / 360)5.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1861/360)]+[(0.0488 x (180/360)) x 82.14% x 100.00 x 1.01]/[(1+11.04)^(1861/360)]3.270.050.26ki
2031-01-09(Dias para cupon / Dias Año)(2041 / 360)5.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2041/360)]+[(0.0488 x (180/360)) x 78.57% x 100.00 x 1.01]/[(1+11.04)^(2041/360)]3.050.050.27ki
2031-07-09(Dias para cupon / Dias Año)(2221 / 360)6.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2221/360)]+[(0.0488 x (180/360)) x 75.00% x 100.00 x 1.01]/[(1+11.04)^(2221/360)]2.850.040.27ki
2032-01-09(Dias para cupon / Dias Año)(2401 / 360)6.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2401/360)]+[(0.0488 x (180/360)) x 71.43% x 100.00 x 1.01]/[(1+11.04)^(2401/360)]2.660.040.27ki
2032-07-09(Dias para cupon / Dias Año)(2581 / 360)7.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2581/360)]+[(0.0488 x (180/360)) x 67.86% x 100.00 x 1.01]/[(1+11.04)^(2581/360)]2.480.040.27ki
2033-01-09(Dias para cupon / Dias Año)(2761 / 360)7.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2761/360)]+[(0.0488 x (180/360)) x 64.29% x 100.00 x 1.01]/[(1+11.04)^(2761/360)]2.320.040.27ki
2033-07-09(Dias para cupon / Dias Año)(2941 / 360)8.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2941/360)]+[(0.0488 x (180/360)) x 60.71% x 100.00 x 1.01]/[(1+11.04)^(2941/360)]2.160.030.27ki
2034-01-09(Dias para cupon / Dias Año)(3121 / 360)8.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3121/360)]+[(0.0488 x (180/360)) x 57.14% x 100.00 x 1.01]/[(1+11.04)^(3121/360)]2.020.030.27ki
2034-07-09(Dias para cupon / Dias Año)(3301 / 360)9.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3301/360)]+[(0.0488 x (180/360)) x 53.57% x 100.00 x 1.01]/[(1+11.04)^(3301/360)]1.880.030.27ki
2035-01-09(Dias para cupon / Dias Año)(3481 / 360)9.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3481/360)]+[(0.0488 x (180/360)) x 50.00% x 100.00 x 1.01]/[(1+11.04)^(3481/360)]1.750.030.26ki
2035-07-09(Dias para cupon / Dias Año)(3661 / 360)10.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3661/360)]+[(0.0488 x (180/360)) x 46.43% x 100.00 x 1.01]/[(1+11.04)^(3661/360)]1.630.030.26ki
2036-01-09(Dias para cupon / Dias Año)(3841 / 360)10.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3841/360)]+[(0.0488 x (180/360)) x 42.86% x 100.00 x 1.01]/[(1+11.04)^(3841/360)]1.520.020.25ki
2036-07-09(Dias para cupon / Dias Año)(4021 / 360)11.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4021/360)]+[(0.0488 x (180/360)) x 39.29% x 100.00 x 1.01]/[(1+11.04)^(4021/360)]1.420.020.24ki
2037-01-09(Dias para cupon / Dias Año)(4201 / 360)11.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4201/360)]+[(0.0488 x (180/360)) x 35.71% x 100.00 x 1.01]/[(1+11.04)^(4201/360)]1.320.020.24ki
2037-07-09(Dias para cupon / Dias Año)(4381 / 360)12.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4381/360)]+[(0.0488 x (180/360)) x 32.14% x 100.00 x 1.01]/[(1+11.04)^(4381/360)]1.230.020.23ki
2038-01-09(Dias para cupon / Dias Año)(4561 / 360)12.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4561/360)]+[(0.0488 x (180/360)) x 28.57% x 100.00 x 1.01]/[(1+11.04)^(4561/360)]1.140.020.22ki
2038-07-09(Dias para cupon / Dias Año)(4741 / 360)13.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4741/360)]+[(0.0488 x (180/360)) x 25.00% x 100.00 x 1.01]/[(1+11.04)^(4741/360)]1.060.020.22ki
2039-01-09(Dias para cupon / Dias Año)(4921 / 360)13.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4921/360)]+[(0.0488 x (180/360)) x 21.43% x 100.00 x 1.01]/[(1+11.04)^(4921/360)]0.980.020.21ki
2039-07-09(Dias para cupon / Dias Año)(5101 / 360)14.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5101/360)]+[(0.0488 x (180/360)) x 17.86% x 100.00 x 1.01]/[(1+11.04)^(5101/360)]0.910.010.20ki
2040-01-09(Dias para cupon / Dias Año)(5281 / 360)14.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5281/360)]+[(0.0488 x (180/360)) x 14.29% x 100.00 x 1.01]/[(1+11.04)^(5281/360)]0.850.010.19ki
2040-07-09(Dias para cupon / Dias Año)(5461 / 360)15.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5461/360)]+[(0.0488 x (180/360)) x 10.72% x 100.00 x 1.01]/[(1+11.04)^(5461/360)]0.790.010.18ki
2041-01-09(Dias para cupon / Dias Año)(5641 / 360)15.67[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5641/360)]+[(0.0488 x (180/360)) x 7.14% x 100.00 x 1.01]/[(1+11.04)^(5641/360)]0.730.010.18ki
2041-07-09(Dias para cupon / Dias Año)(5821 / 360)16.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5821/360)]+[(0.0488 x (180/360)) x 3.57% x 100.00 x 1.01]/[(1+11.04)^(5821/360)]0.680.010.17ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores6.646.64
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(6.64)/(1 + 11.04/100)5.98
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(64.32 - 65.18 )/( 2 x 64.75 x 0.01)0.66
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](61 / 360) ^ 2 + (61 / 360)0.20[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(61/360)]1.730.34i
2026-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](241 / 360) ^ 2 + (241 / 360)1.12[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(241/360)]1.641.84i
2026-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](421 / 360) ^ 2 + (421 / 360)2.54[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(421/360)]1.563.96i
2027-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](601 / 360) ^ 2 + (601 / 360)4.46[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(601/360)]1.486.59i
2027-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](781 / 360) ^ 2 + (781 / 360)6.88[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(781/360)]1.409.65i
2028-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](961 / 360) ^ 2 + (961 / 360)9.80[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(961/360)]+[(0.035 x (180/360)) x 100.00% x 100.00 x 1.01]/[(1+11.04)^(961/360)]4.0539.67ki
2028-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1141 / 360) ^ 2 + (1141 / 360)13.21[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1141/360)]+[(0.035 x (180/360)) x 96.43% x 100.00 x 1.01]/[(1+11.04)^(1141/360)]3.8050.19ki
2029-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1321 / 360) ^ 2 + (1321 / 360)17.13[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1321/360)]+[(0.035 x (180/360)) x 92.86% x 100.00 x 1.01]/[(1+11.04)^(1321/360)]3.5661.03ki
2029-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1501 / 360) ^ 2 + (1501 / 360)21.55[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1501/360)]+[(0.035 x (180/360)) x 89.29% x 100.00 x 1.01]/[(1+11.04)^(1501/360)]3.3471.97ki
2030-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1681 / 360) ^ 2 + (1681 / 360)26.47[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1681/360)]+[(0.0488 x (180/360)) x 85.71% x 100.00 x 1.01]/[(1+11.04)^(1681/360)]3.5092.53ki
2030-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1861 / 360) ^ 2 + (1861 / 360)31.89[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(1861/360)]+[(0.0488 x (180/360)) x 82.14% x 100.00 x 1.01]/[(1+11.04)^(1861/360)]3.27104.16ki
2031-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2041 / 360) ^ 2 + (2041 / 360)37.81[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2041/360)]+[(0.0488 x (180/360)) x 78.57% x 100.00 x 1.01]/[(1+11.04)^(2041/360)]3.05115.36ki
2031-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2221 / 360) ^ 2 + (2221 / 360)44.23[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2221/360)]+[(0.0488 x (180/360)) x 75.00% x 100.00 x 1.01]/[(1+11.04)^(2221/360)]2.85126.02ki
2032-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2401 / 360) ^ 2 + (2401 / 360)51.15[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2401/360)]+[(0.0488 x (180/360)) x 71.43% x 100.00 x 1.01]/[(1+11.04)^(2401/360)]2.66136.07ki
2032-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2581 / 360) ^ 2 + (2581 / 360)58.57[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2581/360)]+[(0.0488 x (180/360)) x 67.86% x 100.00 x 1.01]/[(1+11.04)^(2581/360)]2.48145.44ki
2033-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2761 / 360) ^ 2 + (2761 / 360)66.49[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2761/360)]+[(0.0488 x (180/360)) x 64.29% x 100.00 x 1.01]/[(1+11.04)^(2761/360)]2.32154.06ki
2033-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2941 / 360) ^ 2 + (2941 / 360)74.91[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(2941/360)]+[(0.0488 x (180/360)) x 60.71% x 100.00 x 1.01]/[(1+11.04)^(2941/360)]2.16161.92ki
2034-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3121 / 360) ^ 2 + (3121 / 360)83.83[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3121/360)]+[(0.0488 x (180/360)) x 57.14% x 100.00 x 1.01]/[(1+11.04)^(3121/360)]2.02168.98ki
2034-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3301 / 360) ^ 2 + (3301 / 360)93.25[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3301/360)]+[(0.0488 x (180/360)) x 53.57% x 100.00 x 1.01]/[(1+11.04)^(3301/360)]1.88175.25ki
2035-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3481 / 360) ^ 2 + (3481 / 360)103.17[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3481/360)]+[(0.0488 x (180/360)) x 50.00% x 100.00 x 1.01]/[(1+11.04)^(3481/360)]1.75180.71ki
2035-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3661 / 360) ^ 2 + (3661 / 360)113.59[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3661/360)]+[(0.0488 x (180/360)) x 46.43% x 100.00 x 1.01]/[(1+11.04)^(3661/360)]1.63185.38ki
2036-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3841 / 360) ^ 2 + (3841 / 360)124.51[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(3841/360)]+[(0.0488 x (180/360)) x 42.86% x 100.00 x 1.01]/[(1+11.04)^(3841/360)]1.52189.26ki
2036-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4021 / 360) ^ 2 + (4021 / 360)135.93[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4021/360)]+[(0.0488 x (180/360)) x 39.29% x 100.00 x 1.01]/[(1+11.04)^(4021/360)]1.42192.37ki
2037-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4201 / 360) ^ 2 + (4201 / 360)147.85[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4201/360)]+[(0.0488 x (180/360)) x 35.71% x 100.00 x 1.01]/[(1+11.04)^(4201/360)]1.32194.74ki
2037-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4381 / 360) ^ 2 + (4381 / 360)160.26[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4381/360)]+[(0.0488 x (180/360)) x 32.14% x 100.00 x 1.01]/[(1+11.04)^(4381/360)]1.23196.40ki
2038-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4561 / 360) ^ 2 + (4561 / 360)173.18[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4561/360)]+[(0.0488 x (180/360)) x 28.57% x 100.00 x 1.01]/[(1+11.04)^(4561/360)]1.14197.37ki
2038-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4741 / 360) ^ 2 + (4741 / 360)186.60[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4741/360)]+[(0.0488 x (180/360)) x 25.00% x 100.00 x 1.01]/[(1+11.04)^(4741/360)]1.06197.69ki
2039-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4921 / 360) ^ 2 + (4921 / 360)200.52[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(4921/360)]+[(0.0488 x (180/360)) x 21.43% x 100.00 x 1.01]/[(1+11.04)^(4921/360)]0.98197.40ki
2039-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5101 / 360) ^ 2 + (5101 / 360)214.94[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5101/360)]+[(0.0488 x (180/360)) x 17.86% x 100.00 x 1.01]/[(1+11.04)^(5101/360)]0.91196.52ki
2040-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5281 / 360) ^ 2 + (5281 / 360)229.86[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5281/360)]+[(0.0488 x (180/360)) x 14.29% x 100.00 x 1.01]/[(1+11.04)^(5281/360)]0.85195.10ki
2040-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5461 / 360) ^ 2 + (5461 / 360)245.28[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5461/360)]+[(0.0488 x (180/360)) x 10.72% x 100.00 x 1.01]/[(1+11.04)^(5461/360)]0.79193.18ki
2041-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5641 / 360) ^ 2 + (5641 / 360)261.20[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5641/360)]+[(0.0488 x (180/360)) x 7.14% x 100.00 x 1.01]/[(1+11.04)^(5641/360)]0.73190.77ki
2041-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5821 / 360) ^ 2 + (5821 / 360)277.62[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.0357 x 100.00 x 1.01]/[(1+11.04)^(5821/360)]+[(0.0488 x (180/360)) x 3.57% x 100.00 x 1.01]/[(1+11.04)^(5821/360)]0.68187.94ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [64.75 x ((1 + 11.043) ^ 2)]] x 4319.86]54.11
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2020-09-04
F. de Vencimiento2041-07-09
Ajuste
Dias previos para calculo ajuste o interes
CapitalLa amortizacion se efectuara en VEINTIOCHO (28) cuotas semestrales iguales el 9 de enero y 9 de julio de cada año, con la primera cuota el 9 de enero de 2028 y la ultima cuota el 9 de julio de 2041.
Interesi. Del 4 de septiembre de 2020 (exclusive) al 9 de julio de 2021 (exclusive): CERO COMA CIENTO VEINTICINCO POR CIENTO (0,125%). ii. Del 9 de julio de 2021 (inclusive) al 9 de julio de 2022 (exclusive): DOS COMA CINCUENTA POR CIENTO (2,50%). iii. Del 9 de julio de 2022 (inclusive) al 9 de julio de 2029 (exclusive): TRES COMA CINCUENTA POR CIENTO (3,50%). iv. Del 9 de julio de 2029 (inclusive) al 9 de julio de 2041 (exclusive): CUATRO COMA OCHOCIENTOS SETENTA Y CINCO POR CIENTO (4,875%).
FrecuenciaLas fechas de pago de intereses para los Titulos Amortizables Step Up en USD 2041 son el 9 de enero y el 9 de julio de cada año, comenzando el 9 de julio del 2021.
ISINUS040114HV54
¿Ves algun dato que parece incorrecto?