Activos agregados recientemente:    M31L5   PN40O
Bonos de la Republica Argentina en Dolares 1% Vto. 2029
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2021-07-09100.0016700.00141.490.00141.49
2022-01-09100.0020145.00100.720.00100.72
2022-07-09100.0028125.00140.620.00140.62
2023-01-09100.0032605.00163.030.00163.03
2023-07-09100.0048690.00243.450.00243.45
2024-01-09100.00115299.00576.500.00576.50
2024-07-09100.00138932.00694.660.00694.66
2025-01-0990.00104266.80579.2611585.2012164.46
2025-07-0980.0093774.40527.4811721.8012249.28
2026-01-0970.0082052.60468.8711721.8012190.67
2026-07-0960.0070330.80410.2611721.8012132.06
2027-01-0950.0058609.00351.6511721.8012073.45
2027-07-0940.0046887.20293.0511721.8012014.85
2028-01-0930.0035165.40234.4411721.8011956.24
2028-07-0920.0023443.60175.8311721.8011897.63
2029-01-0910.0011721.80117.2211721.8011839.02
2029-07-090.000.0058.6111721.8011780.41
Expresar en moneda de pago MEP
Datos
SimboloAL29Valor Tecnico105818.55Semana TIR-2.58%
EmisorArgentinaArgentinaValor Residual90.00%Mes TIR-11.95%
TipoSoberanoParidad79.53%Semestre TIR-24.54%
PaísArgentinaTIR12.82%1ero Enero TIR20.15%
MercadoBYMAMacaulay Dur.1.98Año TIR-39.36%
MonedaARSModified Dur.1.75Semana Precio3.28%
Fecha/Hora2025-04-29 17:00:07Effective Dur.0.22Mes Precio-6.18%
Volumen878243Convexidad5.92Semestre Precio2.63%
Precio84160.00Int. Corrido322.351ero Enero Precio-12.87%
Variación-0.81%Cupon12249.28Año Precio31.44%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
92576.0010.00%7.61-40.61%
91734.409.00%8.09-36.87%
90892.808.00%8.58-33.06%
90051.207.00%9.08-29.19%
89209.606.00%9.58-25.24%
88368.005.00%10.10-21.22%
87526.404.00%10.62-17.14%
86684.803.00%11.16-12.97%
85843.202.00%11.70-8.73%
85001.601.00%12.25-4.41%
84160.000.00%12.820.00%
83318.40-1.00%13.404.49%
82476.80-2.00%13.989.07%
81635.20-3.00%14.5813.74%
80793.60-4.00%15.1918.51%
79952.00-5.00%15.8223.37%
79110.40-6.00%16.4528.33%
78268.80-7.00%17.1033.40%
77427.20-8.00%17.7738.58%
76585.60-9.00%18.4443.87%
75744.00-10.00%19.1449.27%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
13.979.00%82489.03-1.99%
13.858.00%82671.45-1.77%
13.727.00%82854.64-1.55%
13.596.00%83038.62-1.33%
13.465.00%83223.39-1.11%
13.334.00%83408.95-0.89%
13.203.00%83595.32-0.67%
13.082.00%83782.49-0.45%
12.951.00%83970.46-0.23%
12.820.00%84160.000.00%
12.69-1.00%84348.860.22%
12.56-2.00%84539.300.45%
12.44-3.00%84730.560.68%
12.31-4.00%84922.650.91%
12.18-5.00%85115.581.14%
12.05-6.00%85309.351.37%
11.92-7.00%85503.971.60%
11.79-8.00%85699.451.83%
11.67-9.00%85895.782.06%
Desarrollo TIR
Desarrollo TIR 12.82%
FechaFormulaOperacionFactorTipo
2025-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (180/360)) x 90.00% x 100.00 x 1172.18]/[(1+12.82)^(70/360)]515.25i
2025-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(70/360)]11450.07k
2026-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (180/360)) x 80.00% x 100.00 x 1172.18]/[(1+12.82)^(250/360)]431.20i
2026-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(250/360)]10779.91k
2026-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (180/360)) x 70.00% x 100.00 x 1172.18]/[(1+12.82)^(430/360)]355.21i
2026-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(430/360)]10148.97k
2027-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (180/360)) x 60.00% x 100.00 x 1172.18]/[(1+12.82)^(610/360)]286.65i
2027-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(610/360)]9554.96k
2027-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (180/360)) x 50.00% x 100.00 x 1172.18]/[(1+12.82)^(790/360)]224.89i
2027-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(790/360)]8995.72k
2028-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (180/360)) x 40.00% x 100.00 x 1172.18]/[(1+12.82)^(970/360)]169.38i
2028-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(970/360)]8469.21k
2028-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (180/360)) x 30.00% x 100.00 x 1172.18]/[(1+12.82)^(1150/360)]119.60i
2028-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(1150/360)]7973.52k
2029-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (180/360)) x 20.00% x 100.00 x 1172.18]/[(1+12.82)^(1330/360)]75.07i
2029-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(1330/360)]7506.83k
2029-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (180/360)) x 10.00% x 100.00 x 1172.18]/[(1+12.82)^(1510/360)]35.34i
2029-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(1510/360)]7067.47k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-04-29(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP x (Dias Corridos / Dias entre Cupones)(0.01 x (180/360)) x 1.00 x 0.9 x 100.00 x 1172.18 x (110/180)322.35
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-07-09(Dias para cupon / Dias Año)(70 / 360)0.19[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(70/360)]+[(0.01 x (180/360)) x 90.00% x 100.00 x 1172.18]/[(1+12.82)^(70/360)]11965.330.140.03ki
2026-01-09(Dias para cupon / Dias Año)(250 / 360)0.69[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(250/360)]+[(0.01 x (180/360)) x 80.00% x 100.00 x 1172.18]/[(1+12.82)^(250/360)]11211.130.130.09ki
2026-07-09(Dias para cupon / Dias Año)(430 / 360)1.19[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(430/360)]+[(0.01 x (180/360)) x 70.00% x 100.00 x 1172.18]/[(1+12.82)^(430/360)]10504.220.120.15ki
2027-01-09(Dias para cupon / Dias Año)(610 / 360)1.69[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(610/360)]+[(0.01 x (180/360)) x 60.00% x 100.00 x 1172.18]/[(1+12.82)^(610/360)]9841.660.120.20ki
2027-07-09(Dias para cupon / Dias Año)(790 / 360)2.19[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(790/360)]+[(0.01 x (180/360)) x 50.00% x 100.00 x 1172.18]/[(1+12.82)^(790/360)]9220.670.110.24ki
2028-01-09(Dias para cupon / Dias Año)(970 / 360)2.69[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(970/360)]+[(0.01 x (180/360)) x 40.00% x 100.00 x 1172.18]/[(1+12.82)^(970/360)]8638.660.100.28ki
2028-07-09(Dias para cupon / Dias Año)(1150 / 360)3.19[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(1150/360)]+[(0.01 x (180/360)) x 30.00% x 100.00 x 1172.18]/[(1+12.82)^(1150/360)]8093.190.100.31ki
2029-01-09(Dias para cupon / Dias Año)(1330 / 360)3.69[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(1330/360)]+[(0.01 x (180/360)) x 20.00% x 100.00 x 1172.18]/[(1+12.82)^(1330/360)]7581.980.090.33ki
2029-07-09(Dias para cupon / Dias Año)(1510 / 360)4.19[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(1510/360)]+[(0.01 x (180/360)) x 10.00% x 100.00 x 1172.18]/[(1+12.82)^(1510/360)]7102.890.080.35ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores1.981.98
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(1.98)/(1 + 12.82/100)1.75
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(83970.93 - 84349.32 )/( 2 x 84160 x 0.01)0.22
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](70 / 360) ^ 2 + (70 / 360)0.23[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(70/360)]+[(0.01 x (180/360)) x 90.00% x 100.00 x 1172.18]/[(1+12.82)^(70/360)]11965.332778.98ki
2026-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](250 / 360) ^ 2 + (250 / 360)1.18[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(250/360)]+[(0.01 x (180/360)) x 80.00% x 100.00 x 1172.18]/[(1+12.82)^(250/360)]11211.1313192.10ki
2026-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](430 / 360) ^ 2 + (430 / 360)2.62[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(430/360)]+[(0.01 x (180/360)) x 70.00% x 100.00 x 1172.18]/[(1+12.82)^(430/360)]10504.2227533.05ki
2027-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](610 / 360) ^ 2 + (610 / 360)4.57[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(610/360)]+[(0.01 x (180/360)) x 60.00% x 100.00 x 1172.18]/[(1+12.82)^(610/360)]9841.6644932.94ki
2027-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](790 / 360) ^ 2 + (790 / 360)7.01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(790/360)]+[(0.01 x (180/360)) x 50.00% x 100.00 x 1172.18]/[(1+12.82)^(790/360)]9220.6764637.17ki
2028-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](970 / 360) ^ 2 + (970 / 360)9.95[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(970/360)]+[(0.01 x (180/360)) x 40.00% x 100.00 x 1172.18]/[(1+12.82)^(970/360)]8638.6685993.31ki
2028-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1150 / 360) ^ 2 + (1150 / 360)13.40[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(1150/360)]+[(0.01 x (180/360)) x 30.00% x 100.00 x 1172.18]/[(1+12.82)^(1150/360)]8093.19108440.00ki
2029-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1330 / 360) ^ 2 + (1330 / 360)17.34[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(1330/360)]+[(0.01 x (180/360)) x 20.00% x 100.00 x 1172.18]/[(1+12.82)^(1330/360)]7581.98131497.03ki
2029-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1510 / 360) ^ 2 + (1510 / 360)21.79[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.1 x 100.00 x 1172.18]/[(1+12.82)^(1510/360)]+[(0.01 x (180/360)) x 10.00% x 100.00 x 1172.18]/[(1+12.82)^(1510/360)]7102.89154756.32ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [84160 x ((1 + 12.8196875) ^ 2)]] x 633760.92]5.92
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2020-09-04
F. de Vencimiento2029-07-09
Ajuste
Dias previos para calculo ajuste o interes
CapitalLa amortizacion se efectuara en DIEZ (10) cuotas semestrales iguales el 9 de enero y el 9 de julio de cada año, con la primera cuota el 9 de enero de 2025 y la ultima cuota el 9 de julio de 2029.
InteresDel 4 de septiembre de 2020 (inclusive) al vencimiento: UNO POR CIENTO (1.00%)
FrecuenciaLas fechas de pago de intereses para los Ti­tulos en USD 2029 son el 9 de enero y el 9 de julio de cada año, comenzando el 9 de julio de 2021.
ISINARARGE3209Y4
¿Ves algun dato que parece incorrecto?